A set of new environmental construction standards for housebuilders that go far beyond current sustainability requirements under building regulations are being launched by the South East of England Development Agency (SEEDA).
The Green Charter, introduced in collaboration with Creative Environmental Networks (CEN), looks at a host of environmental issues with regard to SEEDA's development at Queenborough and Rushenden on the Isle of Sheppey, North Kent, where around 2,000 homes, leisure and community facilities, employment, office and retail space, are set to be built over the next five to 10 years.
The Green Charter is part of a series of documents that form a comprehensive masterplan for the Queenborough and Rushenden area, which has been produced by SEEDA and has now been issued for pubic consultation by the local authority, Swale Borough Council.
It sets targets for the environmental performance of all new buildings, with energy and water sustainability targets at the heart of the agenda. Current plans include the potential for the installation of a Combined Heat and Power (CHP) system serving the whole site, using biomass in the form of woodchip as the main fuel. This type of system simultaneously generates usable heat and electricity in a single process. Furthermore, because trees absorb the same amount of carbon during their lifetimes as they release when burned, they are almost carbon neutral when used as a fuel and therefore lead to significant carbon savings in comparison to fossil fuels. All homes connected to this system would need to meet the Code for Sustainable Homes Level 4 and non-residential buildings would have a requirement to meet BREEAM "Excellent".
Additional measures include smart meters which would allow home owners to monitor their energy use at all times. The development would also seek to minimise resource use through a number of measures including only using timber which is reclaimed, recycled or sourced from sustainably managed forests.
The scheme will provide homeowners with access to both low cost and grant aided sustainable energy measures that will help improve the quality of their homes. Loft insulation, cavity wall insulation, draught proofing, efficient boilers and better heating controls are all part of long list of measures that often pay themselves back within a couple of years.
(JM)
Construction News
13/11/2007
Environmental And Sustainability Standards Launched For Housebuilders

11/07/2025
Story Homes has submitted a full planning application to South Ribble Borough Council for a proposed new residential development in Longton, aiming to build on the success of its nearby Longton Grange scheme.
With the majority of homes now sold at Longton Grange, the developer is looking to meet co

11/07/2025
Essar Energy Transition (EET), through its subsidiary EET Property Limited, has completed the acquisition of Thornton Science Park.
The 66-acre site includes purpose-built laboratories, industrial facilities, and office space, and is set to play a central role in EET's ambition to create one of Eur

11/07/2025
Families are preparing to move into four newly completed houses for affordable rent at the Malthouse Meadows development in West Sompting, Adur.
The latest handover marks a key milestone in the delivery of high-quality, energy-efficient homes aimed at addressing local housing needs.
The four fami

11/07/2025
Galliford Try's project team at the Syngenta manufacturing site in Huddersfield has been shortlisted in two categories at the 2025 Constructing Excellence (CE) Yorkshire and Humber Awards, celebrating the success and resilience of a long-standing partnership spanning over two decades.
The team has

11/07/2025
Cambridgeshire County Council has appointed Morgan Sindall Construction to deliver a new secondary school at the heart of the Alconbury Weald development, continuing its investment in the region's educational infrastructure.
The new school, named Alconbury Weald Church Academy, will be run by the D

11/07/2025
Passengers and residents in Stone, Staffordshire, are being urged to prepare for a £7 million-plus package of railway upgrades set to improve safety, performance and long-term reliability on the West Coast Main Line.
The work, scheduled to take place during the summer school holidays, will include

11/07/2025
A ceremonial tile signing has marked a major milestone in the restoration of the historic Pippbrook House, as roof-level works near completion on the Grade II* listed building in Dorking.
Chair of Mole Valley District Council (MVDC), Councillor Roger Adams, led the event, joined by a host of guests

11/07/2025
ACS Construction Group has been appointed Principal Contractor by GE Vernova for a major infrastructure expansion at its Stafford HVDC Transformers facility, part of the company’s drive to support global decarbonisation through advanced transformer technology.
ACS commenced with the Test Supply Bui

10/07/2025
Vistry Group has agreed two major deals with housing provider Abri to enable the delivery of almost 200 affordable homes across Hampshire, marking a significant step forward in addressing local housing needs.
In Funtley, near Fareham, Vistry has completed a simultaneous land acquisition and forward

10/07/2025
Caddick Construction has officially completed its first Midlands project with the handover of Mansion House, a six-storey residential development comprising 58 new apartments, to joint venture partners Urban Splash and Places for People.
Located on the 43-acre Port Loop island alongside Birmingham