Plans for a £12 million extension at Bedford Academy have been given the go-ahead.
The extension on Mile Road will see 16 state-of-the-art classrooms alongside changing rooms, a dining area, and community café added to the school's facilities.
The new classrooms will have a bright, safe and simple design, with whiteboards and ICT facilities, catering for an additional 300 students.
Following the extension, Bedford Academy is set to be one of the largest secondary schools in Bedford Borough, with ambitious plans to reach a total of 1,800 pupils by 2029.
The two-storey extension will operate to high energy efficiency levels with 'U Values' that ensure minimal heat loss through the facade of the building, as well as designed to achieve Net Zero Carbon in Operation.
Multi-disciplinary firm Pick Everard, operating through Perfect Circle and accelerated under the SCAPE Consultancy framework, has been appointed by Bedford Borough Council to project manage the scheme, alongside GSSArchitecture and Ashe Construction.
Sean Conneely, Director of project management at Pick Everard, said: "This is a fantastic opportunity to provide much-needed additional pupil places and facilities for the children of Bedford and the local community.
"Working collaboratively with the design and construction team, we have engaged with user groups to influence the design, and we will deliver a ‘Net Zero Carbon in Operation’ sustainable building ready for use in September 2025."
The versatility and flexibility of the space will allow Bedford Academy to function as a community hub outside of school learning hours for football, basketball, badminton, faith groups and dance schools.
The multi-use space will also include a kitchen, dining hall and community cafe with Wi-Fi and will be open to parents and visitors during evening and weekend activities, with space for up to 300 people in one sitting.
Chris Chapman, partner at GSS, said: "The building and materials have been carefully chosen to provide a modern and contemporary addition to Bedford Academy.
"We have listened to students, staff and local community groups to ensure that we have designed a modern sustainable building set in the heart of the local community, and we are looking forward to seeing it progress in the future."
A silent study area and office spaces for staff to work will be also included and 300 student lockers will be installed.
20 new car parking spaces, disabled parking and four electric vehicle spaces will be created. The school will also add 77 new cycle spaces to encourage sustainable travel to school.
The project is expected to be completed for the 25/26 school year.
Construction News
25/07/2024
Plans Approved For £12m Extension At Bedford Academy


11/07/2025
Story Homes has submitted a full planning application to South Ribble Borough Council for a proposed new residential development in Longton, aiming to build on the success of its nearby Longton Grange scheme.
With the majority of homes now sold at Longton Grange, the developer is looking to meet co

11/07/2025
Essar Energy Transition (EET), through its subsidiary EET Property Limited, has completed the acquisition of Thornton Science Park.
The 66-acre site includes purpose-built laboratories, industrial facilities, and office space, and is set to play a central role in EET's ambition to create one of Eur

11/07/2025
Families are preparing to move into four newly completed houses for affordable rent at the Malthouse Meadows development in West Sompting, Adur.
The latest handover marks a key milestone in the delivery of high-quality, energy-efficient homes aimed at addressing local housing needs.
The four fami

11/07/2025
Galliford Try's project team at the Syngenta manufacturing site in Huddersfield has been shortlisted in two categories at the 2025 Constructing Excellence (CE) Yorkshire and Humber Awards, celebrating the success and resilience of a long-standing partnership spanning over two decades.
The team has

11/07/2025
Cambridgeshire County Council has appointed Morgan Sindall Construction to deliver a new secondary school at the heart of the Alconbury Weald development, continuing its investment in the region's educational infrastructure.
The new school, named Alconbury Weald Church Academy, will be run by the D

11/07/2025
Passengers and residents in Stone, Staffordshire, are being urged to prepare for a £7 million-plus package of railway upgrades set to improve safety, performance and long-term reliability on the West Coast Main Line.
The work, scheduled to take place during the summer school holidays, will include

11/07/2025
A ceremonial tile signing has marked a major milestone in the restoration of the historic Pippbrook House, as roof-level works near completion on the Grade II* listed building in Dorking.
Chair of Mole Valley District Council (MVDC), Councillor Roger Adams, led the event, joined by a host of guests

11/07/2025
ACS Construction Group has been appointed Principal Contractor by GE Vernova for a major infrastructure expansion at its Stafford HVDC Transformers facility, part of the company’s drive to support global decarbonisation through advanced transformer technology.
ACS commenced with the Test Supply Bui

10/07/2025
Vistry Group has agreed two major deals with housing provider Abri to enable the delivery of almost 200 affordable homes across Hampshire, marking a significant step forward in addressing local housing needs.
In Funtley, near Fareham, Vistry has completed a simultaneous land acquisition and forward

10/07/2025
Caddick Construction has officially completed its first Midlands project with the handover of Mansion House, a six-storey residential development comprising 58 new apartments, to joint venture partners Urban Splash and Places for People.
Located on the 43-acre Port Loop island alongside Birmingham