Working in cities and towns where land is scarce, and property will often be in relatively close proximity to one another, legislation such as The Party Wall etc., Act 1996 may be relevant for your planned building works and developments.

Such legislation will give building owners and adjoining owners and neighbouring property legal rights and obligations under the Act.

Timescales

Developers and project managers need to build in time into their programmes to ensure their project schemes are not delayed by legal formalities, which must be strictly adhered to. It is common knowledge that programme allowances are made for time in applications for Building Regulations approvals and for Planning processes. Consideration must also be given to matters which fall outside those areas, but could possibly cause delays and impact on the project budget. The Project Manager and Client need confidence in their project team to be conversant with the risks and challenges relevant to the project scheme and timescale.

The 'Etc' part of the Party Wall Act

Not all of the Party Wall Act is about 'party walls', with excavations and foundations being an important part of the legislation. Whilst an adjoining owner cannot stop your building project happening, they might be able to delay it before it commences. Arun Associates have acted for both building owners and adjoining owners on many developments and projects, and can identify the critical areas that require action, to minimise delays.

Schedules

Whether we need to assist you serving notices on one adjoining owner or multiple adjoining owners, we can put in place a robust mechanism to ensure that each individual or organisation is dealt with professionally and in a timely fashion. We can prepare detailed schedules of condition, and work closely with structural engineers, adjoining owner’s party wall surveyors, contractors, and your architect and design team.
-- Advertisement --
hss



Meetings

Preparation of Party Wall Awards is second nature to our party wall surveyors. Attendance by our surveyors in design team meetings and site meetings on larger projects, can be incorporated into the project brief, where necessary.

Unexpected Events and Response

Project managers and developers need to be able to have a Party Wall surveyor that can be responsive to unexpected events and issues on the project. A crack develops in a neighbouring property, movement of a sewer pipe in a nearby excavated trench, water filling up adjoining basements due to excavations, the need for additional shoring support to excavations, opening-up of the structure for investigation, - the developer will need confidence in their team at all levels, and have access to the Party Wall surveyor for advice.

Non-Party Wall matters affecting the Project

Apart from Party Wall matters, there can be sometimes, third party constraints and limitations, which may be imposed by the legal rights of neighbours and adjoining owners, on the adjoining site or sites. When commissioned for your project, we can review and identify the risks to you and assess the opportunities arising out of Party Wall matters. These can include boundary matters, rights of light, easements, etc.

Whether this is a simple overview/ feasibility at pre-acquisition stage, or a more detailed technical report on your chosen scheme design, Arun Associates have the experience and knowledge to handle all these third-party matters and more, and propose a cohesive, and pragmatic strategy to manage them for you.

Summary of Services

We provide a simple summary of some of our party wall and associated professional services:

• Acting as Sole Joint Party Wall surveyor, or as a party wall surveyor for the Building Owner / Developer

• Acting as Adjoining Owner’s Surveyor where there would not be a conflict of interest.

• Serving of party structure notices under the Act on behalf of Building Owners / developers

• Serving of Section Six notices on behalf of Building Owners and developers under The Party Wall etc Act 1996

• Preparing and Agreeing Schedules of Condition

• Preparing and agreeing Party Wall Awards relevant to a development project

• Arranging specialist technical reports relevant to Party wall matters such as involving structural engineers, drainage engineers, M&E specialists, etc.

• Giving professional advice on options to the Building Owner / Developer where this is not in conflict with the Party Wall etc., Act 1996.

• Feasibility reports on oversailing of site construction cranes to adjoining property, and the need for licences and consents.

• Investigating boundary issues, rights of light, and easements relevant to a development project.

• Providing detailed summary reports at various stages of the project, in respect of the Party Wall Awards and associated matters.

• Measured Surveys

OPTIONS DIAGRAM

Please refer to the block diagram above which sets out the main options.

We would be acting for the Building Owner or Developer in projects where development of property was being considered, or as Joint Party Wall surveyor where also agreed by the Adjoining Owner(s).

We would only act for adjoining owners alone, where there was no conflict of interest in respect of the Act.

arunassociates.co.uk

Latest Construction News

11/07/2025
Story Homes has submitted a full planning application to South Ribble Borough Council for a proposed new residential development in Longton, aiming to build on the success of its nearby Longton Grange scheme. With the majority of homes now sold at Longton Grange, the developer is looking to meet co
11/07/2025
Essar Energy Transition (EET), through its subsidiary EET Property Limited, has completed the acquisition of Thornton Science Park. The 66-acre site includes purpose-built laboratories, industrial facilities, and office space, and is set to play a central role in EET's ambition to create one of Eur
11/07/2025
Families are preparing to move into four newly completed houses for affordable rent at the Malthouse Meadows development in West Sompting, Adur. The latest handover marks a key milestone in the delivery of high-quality, energy-efficient homes aimed at addressing local housing needs. The four fami
11/07/2025
Galliford Try's project team at the Syngenta manufacturing site in Huddersfield has been shortlisted in two categories at the 2025 Constructing Excellence (CE) Yorkshire and Humber Awards, celebrating the success and resilience of a long-standing partnership spanning over two decades. The team has
11/07/2025
Cambridgeshire County Council has appointed Morgan Sindall Construction to deliver a new secondary school at the heart of the Alconbury Weald development, continuing its investment in the region's educational infrastructure. The new school, named Alconbury Weald Church Academy, will be run by the D
11/07/2025
Passengers and residents in Stone, Staffordshire, are being urged to prepare for a £7 million-plus package of railway upgrades set to improve safety, performance and long-term reliability on the West Coast Main Line. The work, scheduled to take place during the summer school holidays, will include
11/07/2025
A ceremonial tile signing has marked a major milestone in the restoration of the historic Pippbrook House, as roof-level works near completion on the Grade II* listed building in Dorking. Chair of Mole Valley District Council (MVDC), Councillor Roger Adams, led the event, joined by a host of guests
11/07/2025
ACS Construction Group has been appointed Principal Contractor by GE Vernova for a major infrastructure expansion at its Stafford HVDC Transformers facility, part of the company’s drive to support global decarbonisation through advanced transformer technology. ACS commenced with the Test Supply Bui
10/07/2025
Vistry Group has agreed two major deals with housing provider Abri to enable the delivery of almost 200 affordable homes across Hampshire, marking a significant step forward in addressing local housing needs. In Funtley, near Fareham, Vistry has completed a simultaneous land acquisition and forward
10/07/2025
Caddick Construction has officially completed its first Midlands project with the handover of Mansion House, a six-storey residential development comprising 58 new apartments, to joint venture partners Urban Splash and Places for People. Located on the 43-acre Port Loop island alongside Birmingham
Aqua Direct LtdEfco UK LtdLakeside HireStuart CanvasLondon Repointing And Restoration LtdCadfan LtdTotalclean Solutions LtdWorkwear GurusVacuum Pumps UKVacair Superstore