Downing has put forward plans for a major mixed use scheme to create high-quality student accommodation and a new multi-purpose events venue in the heart of Leeds' cultural district.
The proposed development would transform two plots of land adjacent to the Leeds First Direct Arena in the city centre, including the site of the soon to be vacated Yorkshire Bank HQ.
The submission includes a detailed planning application for two purpose-built student accommodation buildings on Merrion Way and Clay Pit Lane and also seeks outline consent for a new multi-purpose events space, the development of which would be taken forward by Leeds City Council at a later date.
The proposed student accommodation scheme will address the need for high-quality student housing in the city. The proposals comprise 1,200 student bedrooms, across two of buildings of 38 and 17-storeys respectively, including a mixture of five and six-bed cluster flats with shared living/dining spaces and individual studio units, along with a range of accessible bedrooms. The sustainable development will incorporate photovoltaic panels and air source heat pumps.
If approved, the plans will also pave the way for the creation of a 9,940 square metre facility at the centre of the Leeds Arena Quarter, designed to attract additional corporate, cultural and live events to the city and provide Leeds' residents with an exciting new amenity.
Based on projections for similar-sized events facilities, it is estimated that a new multi-purpose events space in Leeds could contribute up to £13.5 million of Gross Value Add (GVA) to the local economy every year.
The proposed development of the multi-purpose events space will offer 2,000 square metres of flat floor space used for exhibitions, banqueting, standing and seated entertainment events, 1,700 square metres of breakout and seminar space, and a 900 seat auditorium for conferences. The facility will be able to host popular gigs and shows that require a more intimate space than is offered by the First Direct Arena, but larger capacities than other venues in Leeds, filling a gap in the city's existing events provision. With a range of different spaces potentially available within the venue, it would also provide opportunities for local community led activities and events.
The proposals also have the potential to create approximately 390 jobs in the construction phase and 45 full-time operational roles across the student accommodation and multi-purpose events facility, with the potential for this to rise to up to 200 part-time hospitality positions for large scale events.
The application follows a public consultation which ran in late summer 2021 and found support for the proposed development to be extremely strong, with 85% of respondents stating that they supported the proposals overall.
Construction News
28/03/2022
Plans Put Forward For Mixed Use Scheme In Leeds


30/04/2025
Construction has been completed on 368 build-to-rent apartments at West Bar in Sheffield, marking the successful delivery of the £300 million development's first phase.
The handover of the homes for occupation comes alongside the completion of a 100,000 sq ft office building and a new public squar

30/04/2025
United Living Group has announced that its subsidiary, United Living Energy Limited, part of the United Living Infrastructure Services (ULIS) division, has been appointed by Liverpool Bay CCS Limited (LBCCS), a subsidiary of global energy-tech company Eni, as one of the main contractors for a major

30/04/2025
Construction has begun on one of Birmingham's most eagerly awaited regeneration projects, Upper Trinity Street.
The development is a joint venture between Caddick Construction, Cole Waterhouse, Taurus Investment Holdings and Housing Growth Partnership.
The start of work on the Digbeth-based scheme

30/04/2025
Henry Boot Construction has been appointed to build a new environmentally friendly Maintenance Delivery Unit (MDU) for Network Rail in Barnetby, North Lincolnshire.
The project, located adjacent to Barnetby Station, will see the construction of a modern, two-storey 9,500 sq ft facility designed to

30/04/2025
Work is now underway on a new sustainable housing development in Salford, specifically designed for residents aged 55 and over.
The project, led by housing association Salix Homes in partnership with main contractor Caddick Construction, will deliver 69 energy-efficient homes on disused land at Ar

30/04/2025
Winvic Construction Ltd has revealed plans for its pavilion at UKREiiF 2025, announcing a new partnership with Leeds-based charity Zarach as part of its commitment to community impact and industry collaboration.
Titled the 'Winvic and Partner's Hub', the pavilion will serve as a space for thought l

30/04/2025
G F Tomlinson has officially broken ground on the University of Nottingham’s new hydrogen propulsion systems laboratory, a £5 million state-of-the-art facility set to transform clean energy research at the university's Jubilee Campus.
Scheduled for completion in December, the facility will support

30/04/2025
McLaren Construction Midlands and North has been appointed to lead the delivery of Plot 4 at the Matrix 49 industrial development in Avonmouth, Bristol.
The project is being undertaken on behalf of Equation Properties Ltd.
Work began on site in February 2025, with the 66-week construction programm

30/04/2025
Track and Wire Sawing at the Cotswold Canal.
As part of the lottery funded restoration project for the Stroud Valley Canal, we were approached to help with the restoration of Blunder Lock.
History of Blunder Lock
Blunder Lock was built in the mid-late 1770s and is part of the Eastington F

30/04/2025
Passengers at Leatherhead station are now benefiting from significantly improved accessibility following the completion of a £6.2 million upgrade led by Network Rail and funded through the Department for Transport's 'Access for All' programme.
The major enhancement includes the opening of a new ful