Civil engineering students at Queen's University Belfast (QUB) have successfully built the worlds longest Meccano bridge.
The 30 metre long structure was lowered by McLaughlin & Harvey across the Clarendon Dock.
Officials from the Guinness Book of Records verified the record attempt in a ceremony on Saturday, 19 September.
McLaughlin & Harvey provided technical expertise, resources and a warehouse in which the bridge components were assembled and tested.
On-site engineers managed the relocation of the structure to the Clarendon Dock, along with its installation across the water.
The overall length of the bridge is 28.76 metres and the main span is 18 metres. The height of the structure is 6.25m and weighs 600kg.
Overall, 11,000 pieces of Meccano were used on the year-long project.
John McCarey, Chief Engineer at McLaughlin & Harvey, said: "It has been exciting working closely with both the academics and students of Queen's university on this successful record attempt. Through our experience we have been able to support these engineers of the future create something that people around the world will be able to see. To have built an entire structure just from Meccano required a great deal of technical expertise and we are pleased that our team has been part of that."
Danny McPolin, Senior Structures Lecturer at Queen's University, added: "This event is not only an opportunity to celebrate the student and staff's incredible work over the past year, but also a chance to show local children more about the opportunities in STEM based careers and encourage them to consider a future studying civil engineering."
The bridge will remain at the docks until it is dismantled later this month.
(LM/MH)
Construction News
22/09/2015
QUB Students Build Record Meccano Bridge


30/04/2025
Construction has been completed on 368 build-to-rent apartments at West Bar in Sheffield, marking the successful delivery of the £300 million development's first phase.
The handover of the homes for occupation comes alongside the completion of a 100,000 sq ft office building and a new public squar

30/04/2025
United Living Group has announced that its subsidiary, United Living Energy Limited, part of the United Living Infrastructure Services (ULIS) division, has been appointed by Liverpool Bay CCS Limited (LBCCS), a subsidiary of global energy-tech company Eni, as one of the main contractors for a major

30/04/2025
Construction has begun on one of Birmingham's most eagerly awaited regeneration projects, Upper Trinity Street.
The development is a joint venture between Caddick Construction, Cole Waterhouse, Taurus Investment Holdings and Housing Growth Partnership.
The start of work on the Digbeth-based scheme

30/04/2025
Henry Boot Construction has been appointed to build a new environmentally friendly Maintenance Delivery Unit (MDU) for Network Rail in Barnetby, North Lincolnshire.
The project, located adjacent to Barnetby Station, will see the construction of a modern, two-storey 9,500 sq ft facility designed to

30/04/2025
Work is now underway on a new sustainable housing development in Salford, specifically designed for residents aged 55 and over.
The project, led by housing association Salix Homes in partnership with main contractor Caddick Construction, will deliver 69 energy-efficient homes on disused land at Ar

30/04/2025
Winvic Construction Ltd has revealed plans for its pavilion at UKREiiF 2025, announcing a new partnership with Leeds-based charity Zarach as part of its commitment to community impact and industry collaboration.
Titled the 'Winvic and Partner's Hub', the pavilion will serve as a space for thought l

30/04/2025
G F Tomlinson has officially broken ground on the University of Nottingham’s new hydrogen propulsion systems laboratory, a £5 million state-of-the-art facility set to transform clean energy research at the university's Jubilee Campus.
Scheduled for completion in December, the facility will support

30/04/2025
McLaren Construction Midlands and North has been appointed to lead the delivery of Plot 4 at the Matrix 49 industrial development in Avonmouth, Bristol.
The project is being undertaken on behalf of Equation Properties Ltd.
Work began on site in February 2025, with the 66-week construction programm

30/04/2025
Track and Wire Sawing at the Cotswold Canal.
As part of the lottery funded restoration project for the Stroud Valley Canal, we were approached to help with the restoration of Blunder Lock.
History of Blunder Lock
Blunder Lock was built in the mid-late 1770s and is part of the Eastington F

30/04/2025
Passengers at Leatherhead station are now benefiting from significantly improved accessibility following the completion of a £6.2 million upgrade led by Network Rail and funded through the Department for Transport's 'Access for All' programme.
The major enhancement includes the opening of a new ful