Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,409 companies....

Construction News

03/06/2024

Plans Put Forward For £45m Office Development In Blackpool

Plans have been put forward for a new £45m office development in Blackpool.

Full planning permission is being sought for a 52,950 sq ft office building off Talbot Road, which would bring over 1,000 additional employees into Blackpool town centre.

The land, on the site of the former Apollo 2000 store, sits within the boundary of the Talbot Gateway development around Blackpool North train station and will bring an additional economic benefit to the town centre.

Blackpool Council and its development partner Muse are in advanced discussions with an organisation that wishes to develop and occupy a new office within the town centre.

Cllr Mark Smith, Cabinet Member for Levelling Up (Place) at Blackpool Council, said: "This is another major step forward in our plans to make Blackpool better and boost our local economy. The area around the train station was previously a desolate area in desperate need of regeneration. Over the last ten years we have regenerated it into a desirable location for businesses looking for quality office space on the Fylde coast. Our initial ambition and investment to build the earlier phases of the Talbot Gateway has led us to be in this position where more organisations are approaching us to help them move their jobs into the town centre. In turn, that has a huge potential for the private sector to continue to invest in Blackpool, creating more opportunities for business and creating more year-round, well-paid jobs for local people."

-- Advertisement --
hss

Alan McBride, Technical Director at Muse, said: "The fifth phase of Talbot Gateway will provide a further catalyst for Blackpool’s renaissance, helping to spur additional economic growth in the town by delivering yet more future-proofed workspace to benefit business in the region. "Our long-standing partnership with Blackpool Council has already played a pivotal role in the regeneration of the town, and this development would mark yet another notable staging point on the journey towards reframing this iconic seaside destination."

Phase one, including new Grade A offices, Sainsbury’s supermarket and an upgraded 650 space multi-storey car park, was completed in 2014. Phase two, a new 144 bed Holiday Inn hotel and Marco Pierre White New York Italian restaurant opened on 1 May 2024. A tramway extension, interchange with the train station and surrounding retail units are due to open next month.

Phase three, a Civil Service Hub office for over 3,000 government workers is under construction and expected to open in 2025, while planning consent has been granted for a Multiversity campus for Blackpool and the Fylde College in phase four, bringing up to 3,000 more students and staff into the area.

The Talbot Gateway is a sustainable development regenerating the heart of Blackpool around the main train station, which currently receives two million passengers per year, with the number expected to rise as new developments are completed.

Latest Construction News

23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
23/07/2026
Galliford Try has won a £47.5m contract from Thames Water to deliver the Camberley Sewage Treatment Works (STW) Flow Compliance scheme, aimed at improving performance, strengthening resilience and ensuring environmental compliance at the facility. The programme will boost flows through the inlet wo
Read More
23/07/2026
The Engineering Construction Industry Training Board's (ECITB) Project Management Steering Group (PMSG) has unveiled a new e-learning academy to strengthen project management capability across the engineering construction industry (ECI). Hosted on ECITB's award-winning Learning Experience Platform
Read More
23/07/2026
Baroness Smith of Malvern met key stakeholders and secondary school students at a major careers fair organised by All Together Cumbria, before taking part in a special summit focused on tackling the number of young people not in education, employment or training (NEET) in West Cumbria. The festival
Read More
23/07/2026
The Federation of Master Builders (FMB) has welcomed a trio of Cabinet appointments, arguing they offer a chance to speed up housing delivery, ramp up home retrofit and back construction SMEs. The organisation pointed to Angela Rayner becoming Housing Secretary, Matthew Pennycook’s elevation to Cabi
Read More
23/07/2026
McLaughlin & Harvey has secured a contract valued at more than £100m to deliver a new combat air facility for Rolls-Royce in Bristol. The site will accommodate research, manufacturing and assembly, creating capacity for new product development to support the future of air combat. Construction is ex
Read More
23/07/2026
GRAHAM has delivered a 90-metre, 150-tonne pedestrian, cycle and equestrian bridge over the A10 in Cambridgeshire, creating a traffic-free route between Waterbeach New Town, Cambridge Science Park and the city centre. Commissioned by developer Urban&Civic as part of the Waterbeach New Town scheme,
Read More
23/07/2026
MCI Developments, a subsidiary of Keepmoat, is set to deliver 44 affordable homes off Hardman Avenue in Rawtenstall in partnership with Mosscare St Vincent's Housing Group (MSV). The scheme, approved in full by Rossendale Borough Council earlier this year, will provide a mix of one, two and three-b
Read More
22/07/2026
Kier has been appointed to the new YORhub YORbuild Major Works 2 framework, worth £1.5bn, enhancing its capacity to deliver major public sector projects across Yorkshire and the Humber, the North East and neighbouring areas. The framework provides access to substantial building schemes for eligible
Read More
22/07/2026
Permasteelisa Group has been appointed to deliver the façade refurbishment of 60 Queen Victoria Street in the City of London. Working alongside Mace Construct, the team will remove the original envelope from the nine-storey building, refurbish and reinstall it, and design, manufacture and install n
Read More
Pro Structures LtdBRICOFLOR UKLakeside HireRewire SecurityCommfire LtdAccess Design & Safety Ltd365 vacexPlantation Shutters Ireland LtdSevenoaks Environmental Consultancy LtdPTP Architects London Ltd