Barhale has scooped a £16.8 million contract to improve and upgrade a water trunk main running through the London Boroughs of Barnet and Enfield.
The work, which forms part of Thames Water's AMP7 Conditional Allowance Trunk Main Schemes, will protect future water supply in the area.
Just over 2.3 kilometres of pipe will be replaced by Barhale along a new route running north west from Pert Close, Barnet to the southern end of Cannon Hill, Enfield. The new pipeline will be laid through the Friern Barnet retail park, and within:
Station Road
Inverforth Road
Upper Park Road
Palmers Road
Bowes Road
Brookdale
Arnos Park
Arnos Grove
Sections of the route will be tunnelled beneath the A406 North Circular Road, the East Coast Main Line and Pymmes Brook, eliminating disruption at these critical infrastructure crossings.
Barhale will replace the existing 24" steel pipe with a combination of ductile iron or steel and high-density polyethylene pipe laid using open cut trenches and micro-tunnelling.
Shafts will be excavated either side of each tunnel section to serve as launch and reception chambers for the tunnelling works, which will make up 250 metres of the total length.
Shane Gorman, Barhale's Water Director – Southern Region, said: "Now is this right time to upgrade this aging main pipe. Installing a new trunk main will ensure this section of the water network is in optimum condition for the future.
"This is a significant mains upgrade programme in a busy part of London and we have worked closely with Thames Water to ensure that the design maximises value while minimising potential disruption."
Construction News
11/09/2023
Barhale Scoops £16.8m Contract


23/06/2025
Housebuilder Story Homes has submitted an outline planning application to Chorley Council for a major new residential development on the site of the former Camelot Theme Park.
The proposal outlines the creation of up to 350 new homes, with a significant commitment to affordability—50% of the proper

23/06/2025
A major step forward has been taken in the development of the £45 million Howden Relief Road, with East Riding of Yorkshire Council awarding the main construction contract to infrastructure specialists Aureos.
The Sheffield-based contractor will begin work in early July on the long-anticipated proj

23/06/2025
Passengers at Chalkwell station in Essex are set to benefit from step-free access for the first time, as Network Rail awards a £7.9 million contract to Octavius to deliver major accessibility upgrades under the Department for Transport's 'Access for All' (AfA) programme.
In partnership with train o

23/06/2025
Barhale is playing a key role in tackling sewer overflow incidents as part of Severn Trent’s Rapid Action Taskforce Spills (RATS) scheme, an initiative aimed at reducing Combined Sewer Overflow (CSO) discharges through fast, targeted interventions across the Midlands.
The £570,000 scheme spans mult

23/06/2025
Galliford Try's Asset Intelligence division has been crowned Installer of the Year at the prestigious British Security Awards, a national event that celebrates excellence and innovation across the UK security industry.
The recognition highlights the team's outstanding work in the water sector, wher

23/06/2025
In construction, machine performance isn't just about horsepower or hydraulics — it’s about what happens when the machine leaves the dealership and starts work onsite. For many contractors, plant downtime can stall entire projects, costing time, money, and reputation.
While price and spec still dom

23/06/2025
In a push for more sustainable building solutions, STEICO Flex is making waves in the construction industry as a high-performance, eco-friendly insulation option. Manufactured from flexible wood fibre, STEICO Flex batts are gaining recognition for their superior thermal performance, breathability, a

23/06/2025
Sogelink has collaborated with the UK government's National Underground Asset Register (NUAR).
NUAR is a landmark initiative aiming to centralise and standardise access to underground asset data across England, Wales and Northern Ireland.
Driven by the Geospatial Team in the Government Digital S

23/06/2025
Work is set to begin in late July on a new pedestrian footbridge at Kennedy Road in Barking, restoring a vital crossing that has been out of use since 2022.
Specialist contractor Taziker, known for its expertise in bridge removal and installation across the rail network, has been appointed to deliv

20/06/2025
McLaren Construction Midlands and North has completed the £12.8 million B4 industrial scheme at Manchester Airport, marking a significant step in the ongoing regeneration of the World Freight Terminal.
Delivered in partnership with Columbia Threadneedle Investments, the high-spec 92,000 sq. ft. un