Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,394 companies....

Construction News

06/05/2022

£3m Enfield Scheme Successfully Completed

A £3 million scheme for the refurbishment of a major office space in Enfield has been completed, being delivered on time and within budget for Enfield Council.

The refurbishment of the Edmonton Library Housing Hub, which has been in the works for more than six years, is a part of Enfield Council's ambitious plans to provide a 21st century library experience for all of its residents. The two-storey library has been carefully designed to maximise productivity and will include extra study spaces for children and students, free Wi-Fi, a customer access kiosk, as well as a dedicated local history and museum space to celebrate the area's rich history.

Leading independent property, construction, and infrastructure consultancy, Pick Everard, operating under Perfect Circle's unique collaboration was appointed by Enfield Council through SCAPE's Built Environment Consultancy Services (BECS) framework to provide architectural and design support, while also supporting with mechanical, electric and project management services.

Maintaining a close collaboration with Wilmott Dixon Interiors throughout, Pick Everard was able to deliver the project with a highly responsive service, quickly and efficiently adapting to changes in the programme requirements during the construction. Using NEC change-management mechanisms, Pick Everard was able to act cooperatively and openly to develop solutions that minimised the impact on timings and costings.

-- Advertisement --
hss

John Clarke, director for project management at Pick Everard, said: "We are very happy to have worked collaboratively with the wider team to deliver this new functional space for Enfield Council to support the local community in the area.

"One of the key challenges faced on this project was keeping the library operational during the refurbishment process. The difficulty of this was minimised greatly through regular meetings with the construction management team and library staff. This sustained communication, and regular feedback was key to a successful live working environment.

"Ultimately. The entrance of the library was kept open to the public, while access to the construction site was set up via a balcony window on the second floor to the rear of the building. We also completed standardised risk assessments, air quality testing, and environmental monitoring."

Alongside the obvious benefit to the learnings of local children and students, there has been a range of intentional decisions from Pick Everard to benefit the local community. This has included the employment of local people to work on the site, while the wider development team has placed emphasis on education by supporting staff to develop and upskill and visiting schools in Enfield.

Furthermore, an emphasis was placed on sustainability throughout the project. All of the lighting designed implemented into the space is energy efficient and utilises smart controls, amongst many other benefits, including automatic adjustment to suit the environment changes to stay at peak energy efficiency.

As well as this, the project ensured that existing doors were either reused or repainted throughout the development and Pick Everard's design of replacing the existing gas-fired heat pumps with electric heat pumps was a notable contribution regarding sustainability. 

Adrian Ceney, partner at Pick Everard, said: "Communication with the site team was also vital in regard to the pre-site checks, allowing us to accurately point out existing issues within the development and address them promptly to avoid large delays in the overall programme. This pre-planning approach meant we were able to gather the substantial information needed to find the best solutions before problems arose, meaning that the initial building condition had minimal impact on the overall timescales.

"It has been one of our key objectives to ensure harmony across the site and I believe that the development team has done that. To know that we have provided an excellent learning space for future generations, while also placing a particular emphasis on sustainability, demonstrates Pick Everard's commitment to forward-thinking."

Latest Construction News

17/07/2026
Jacobs has secured three new commissions with National Highways, strengthening its role in supporting the modernization, resilience and long-term performance of the UK’s strategic road network. The appointments will see Jacobs deliver key asset renewal and project leadership services designed to im
Read More
17/07/2026
Vistry and Platform Housing Group have joined forces to deliver a 177-home, 100% affordable housing development on the former Simon Digby School site in Chelmsley Wood, Solihull. The 4.5-hectare site, which has been identified for residential development for more than a decade, will see Platform Ho
Read More
17/07/2026
A new housing development in Devizes is set to deliver more than £3.5 million in funding for local services and infrastructure, as the first homes are completed at the site. Bellway's Lock Keeper Gardens development, located on land between Coate Road and the Kennet and Avon Canal on the eastern ed
Read More
17/07/2026
Morgan Sindall Construction has been reappointed to both value bands of the new £1.5bn YORbuild Major Works 2 framework, which will deliver major public-sector building projects across Yorkshire and the Humber and adjacent areas. The renewed places extend the company's long-standing partnership wit
Read More
17/07/2026
As the UK construction industry continues to demonstrate resilience amid ongoing economic uncertainty, experts within the invoice finance sector are reporting increased demand from construction businesses seeking flexible working capital solutions to support growth, manage rising costs, and overcome
Read More
17/07/2026
Preparatory works have commenced in West Vale on a transport improvement programme designed to better link Elland town centre with neighbouring areas. Approved by planners in November 2024, the package aims to deliver safer, more convenient routes and to enhance access to the planned new Elland Rai
Read More
17/07/2026
Sefton Council's cabinet will next week be asked to approve the next stage of its Sefton 2030 housing programme, enabling partner The Sovini Group to start feasibility work on three potential development sites: the former Ainsdale Hope School, the Professional Development Centre in Formby, and the f
Read More
17/07/2026
The Mayor of Olney, Councillor Debbie Whitworth, has officially opened a new community facility at Yardley Manor, a mixed-tenure residential development being delivered by Vistry and Taylor Wimpey in Buckinghamshire. The new building has been created as a central meeting place for residents and loc
Read More
17/07/2026
Yorkshire Water has begun work to upgrade equipment at the Ecclesall Road and Granville Road combined storm overflows (CSOs) in Sheffield. The works involve installing new mechanical screens, kiosks and control panels, alongside upgrades to mechanical and engineering instrumentation, to improve the
Read More
17/07/2026
Knowsley Council's Cabinet has agreed to move forward with the next stage of investment in Kirkby town centre, approving plans for a leisure-led scheme at the heart of the town. The Council has already committed more than £43.8 million to Kirkby since purchasing the town centre from the private sec
Read More
Lakeside HirePro Structures LtdBRICOFLOR UKInterior 360MPC Services (UK) Ltd.Insulation Store OnlineLakeside HirePrecision Utility MappingGateFixNIAllstar Systems (Norwich) Ltd