A common problem facing building companies, contractors and landscapers on completion of a development is compaction. The movement of traffic and materials across the ground to buildings under construction leaves areas prone to waterlogging. Newly laid gardens, grassed and play areas in particular become susceptible, with compaction occurring far deeper than normal aerating will alleviate. Deep penetration aeration is the solution but how do you know what lies beneath the grass and to what depth the aeration is needed? Terrain Aeration has been treating such problems for over twenty-five years and works regularly with construction companies such as Taylor Wimpey, Barrett Homes, Laings and smaller developers to provide a long-term solution.
The Terrain Aeration Terralift machines penetrate the ground to a depth of one metre, releasing a blast of compressed air which fractures and relieves the compacted soil, creating permanent aeration and drainage. However, before carrying out the aeration it is often necessary on old site layouts to determine what lies beneath and Terrain Aeration take a core sample using their specialist machinery. The plastic sleeve which slides out of the metal casing reveals what the soil is like, from the top soil down to the clay structure beneath. The soil cores are taken to one metre depth and are also very good indicator to show where oil and diesel spillages have penetrated and how deep. The Terralift can then deal with the oil-bioremediation using specialist products in the area down to one metre depth.
Further down, flint is encountered and the Terralift probe is designed to break through the solid layers, employing a JCB hammer incorporated as part of the machine. Once the hard materials have been penetrated, the compressed air blast released creates fractures and fissures. These are injected with dried seaweed as part of the process, keeping, in this case, the clay seen in the core sample open and allowing surface water to quickly drain down one metre, before naturally percolating away into the flint area.
What is an ex-car park area has been transformed into a healthy soil structure with good root zone and ready for children to play on. Of course, not all compacted ground will have the same strata but the Terrain Aeration process is used to treat all types of waterlogging, from small gardens to parks, public spaces and sports pitches to bowling greens.
Contact Terrain Aeration at www.terrainaeration.co.uk or 01449 673783.
Construction News
20/11/2018
Terrain Gets To The Core


16/05/2025
South Dock Marina in Southwark is set for a major £8 million overhaul aimed at improving health and safety across the site, following the recent approval of a redevelopment plan.
Led by Southwark Council, the upgrade programme has been granted planning permission, pending further consultation with

16/05/2025
The South Rail Systems Alliance (SRSA) has completed a major programme of infrastructure upgrades on the West Anglia main line.
Appointed in September 2023, the SRSA, comprising Colas Rail UK, Network Rail, and AECOM, delivered a package of works between Shepreth and Cambridge. This multidisciplina

16/05/2025
London Gatwick has announced a major partnership with renewable energy provider Vital Energi to deliver a £250 million decarbonisation programme, aimed at achieving net zero for the airport’s own emissions by 2030.
Under a five-year contract, Vital Energi will help the airport transition away from

16/05/2025
Dale Turner, Director of Procurement and Supply Chain at Skanska UK, has been appointed Chair of the Supply Chain Sustainability School.
Turner succeeds Shaun McCarthy OBE, who co-founded the School in 2012 and has led it since its inception. McCarthy will now transition into a roaming ambassador r

16/05/2025
Dudley's Aluminium has taken a major step in its journey to net zero by installing a large-scale solar energy system at its production facility in Cardiff.
The company partnered with Inspire Green, a renewable energy specialist operating across south Wales and south-west England, to fit 192 high-ef

16/05/2025
If you're searching for architects in Tunbridge Wells, you're likely planning something exciting — from a home extension or renovation to a brand-new build.
At Alex Bryla Architecture, we specialise in bespoke architectural design, offering a fresh and creative approach tailored to the uniq

15/05/2025
A major expansion of the Port of Tilbury has been set in motion as owners Forth Ports has submitted an outline planning application to Thurrock Council for the development of a new port facility, Tilbury3 (T3).
The proposed project will redevelop a 100-acre brownfield site—equivalent to 70 football

15/05/2025
Morgan Sindall Construction has commenced work on a capital works programme at the University of Leeds campus.
It was announced earlier this year that Morgan Sindall has been appointed to the programme, which will entail refurbishment of existing university spaces and entrances as well as reroofing

15/05/2025
Construction has officially begun on the long-awaited Marple Community Hub, a £20 million development that will bring a state-of-the-art leisure, health and library complex to the heart of Stockport.
Local leaders, partners, and the main contractor Willmott Dixon gathered in Marple Memorial Park fo

15/05/2025
Great Places Housing Group recently welcomed senior leaders from Manchester City Council to tour the final phase of its flagship £19.4 million Wiremill Court development in New Islington.
Council Leader Cllr Bev Craig and Cllr Gavin White, Executive Member for Housing and Development, visited the s