Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

18/03/2009

Hall Lane Work Begins

Work is getting under way on the first phase of a scheme to relieve one of the biggest traffic problems in Liverpool.

The Hall Lane Strategic Gateway scheme is a £20m project which will greatly improve the route into the city centre from the M62 as well as removing a notorious bottleneck.

The first phase of the project involves site clearance, the acquisition of buildings, demolition of some buildings and work on utilities diversions.

It is hoped that approval for the funding for the main phase of the work will be granted by the Department for Transport at the end of next month with work starting on the second phase in June. Funding is also being provided under the European Regional Development Fund.

The scheme will improve the situation for traffic heading to the city centre from Edge Lane, which currently must turn either left or right into Hall Lane or Towerlands Street at the top of Mount Vernon Green.

-- Advertisement --
hss

Both of these routes are residential roads and traffic is subject to delay.

New road alignments will take traffic away from the residential areas of Hall Lane and Towerlands Street and will be in dual carriageway for most of its length.

There will be a new junction at West Derby Street/Crown Street directing traffic north along a new stretch of road towards Low Hill and then on to Islington, or south along a realigned Grove Street.

The junction at Low Hill will be improved and this new link will improve traffic flow between Islington and Grove Street.

Pedestrian facilities will be provided at all traffic signal controlled junctions and cycling facilities are also being introduced. The scheme will include extensive landscaping, including tree planting, and improved lighting.

A residents parking scheme is being prepared for the Kensington Fields area.

Cllr Peter Millea, Executive Member for Assets and Development, said: "The local community, as well as motorists, will be delighted that the Hall Lane scheme is under way.

"It will provide much better access into the city centre and a much better environment for the neighbourhood.

"It will also provide a new frontage to the Royal Liverpool Hospital development and will be a much better gateway to the city."

Work is due for completion by the end of 2010.

(CD/JM)

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Lakeside HirePro Structures LtdBRICOFLOR UKGroundforceTPA - Temporary Access SolutionsLondon DeckingCeiling Tech ltdMiller & PartnerDG Gas Safety LtdAtlas Site Engineering Ltd