Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

23/02/2009

Steni Panels Bring A Colourful New Look To Children's Centre

Colourful rainscreen cladding panels from Steni were specified by MeadowcroftGriffin Architects to meet a host of criteria for an extension to a children's centre in north London.

More than 200m2 of "steni colour" fibreglass reinforced polymer composite panels, that feature a smooth surface of electron beam cured acrylic that is produced without the use of solvents, were specified in four high-gloss colours for New River Green Children's Centre in Islington.

The extension was recognised as a key regeneration scheme for the local community and had to achieve a new identity to help the centre stand out on the old Marquess housing estate just off Balls Pond Road, a major east-west route, along with requirements for durability, low-maintenance and robustness in the face of vandal attacks.

The existing centre was constructed in timber frame over a low and sprawling single storey as a purpose-built nursery for 75 children. Part of it was converted to form a family project in a small suite of rooms on the street frontage seven years ago that provided flexible crèche and drop-in events for 200 families on a weekly basis. This successful facility was struggling to meet demand due to lack of space and shared entrance which led to conflicts of security.

MeadowcroftGriffin's brief from the London Borough of Islington's early years department was to provide a sustainable solution - a flexible range of spaces that could accommodate a wide variety of activities to support families with young children, ranging from creche facilities to training space and health and counselling rooms. New office space and staff room was also required.

-- Advertisement --
hss

But planning restrictions prevented any extension to the front of the existing building line and the rear of the site was mature play garden with significant trees that could not be removed. The only space to extend the building was over the footprint of the family project area, which required partial demolition and rebuilding with an additional storey.

The design also had to bear in mind that while the centre had been a much more visible community building in the past, multi-storey blocks of housing had been built on the open land surrounding the site and its visibility had suffered as a result, to the extent that is was frequently reported to be hard to find.

The centre's community presence needed raising to ensure full access to the services for all families and carers and above all, it needed to be inspirational to children, families, staff and all who used it.

It also needed to be attractive, durable, energy efficient and represent good value for money as well as secure, vandalism having been a particular problem in the past due to youths climbing over the perimeter railings and damaging external play equipment and breaking windows,.

The north-west façade of the new, 275m², two-storey, timber-framed extension was clad vertically with the steni colour panels using screws and battens by specialist sub-contractor D&G Contracts over one month of the seven-month total build.

The steni colour panels, which are available in 40 standard colours, different gloss levels and two thicknesses, were designed in a water based theme using blues and greens to reflect the nearby river and as a playful statement announcing the new building on the corner.

MeadowcroftGriffin director Ann Griffin said: "The Steni material was specified as a durable material that would be low-maintenance. We selected the colours to signify a water based theme to reflect the location adjacent to the local river. The gloss factor on the panels was also key in portraying this theme.

"The two key facades facing the public realm use the Steni product and the other two facing the mature garden which connect to the existing building are clad in timber. We felt a lot could be achieved using well-targeted, specific interventions - low-cost approaches to effect maximum change. We also sought to use materials with low environmental impact."

D&G's managing director Gerry Kelly said: "Although it was a tight site and there were boundary restrictions, it was a standard installation for this type of product but we were impressed with it."

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Pro Structures LtdLakeside HireBRICOFLOR UKCrucial ServicesVally Plant Training LtdSmoke VentsRooflights & SkylightsM-Tech Engineering LtdCabin MasterLyttle Smart Homes Ltd