Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,409 companies....

Construction News

23/10/2008

It's Hot In The Y.M.C.A.

The Montclair Y.M.C.A in New Jersey, America has two swimming pools and shower facilities that require constant hot water - presenting a big challenge to the management and maintenance teams. With such a demand on the heat exchangers, limescale build-up has been a perennial problem; not only does it increase fuel usage, but if left unchecked could result in equipment failure. The centre therefore had to regularly take them off-line to descale the heat exchangers. However, the problem has now largely been removed due to the installation of Hydropath’s ‘Hydroflow’ water treatment system. Due to the large diameter pipes, a Hydroflow C unit was required; the unit is designed to prevent limescale build up in large diameter pipes in commercial installations. Because it affects the property of the water flowing through the system, it can also help remove existing deposits.

"Heating the water caused a scale build up in the heat exchanger tubes, and there was a big loss of heat transfer due to this build up", says Sal Maffettone the Vice President of Metric Plumbing & Heating, who has been responsible for all the centre’s major plumbing and maintenance for the past five years.

-- Advertisement --
hss

The site has previously attempted to increase the life of their appliances, and improve the efficiency of the heat exchangers and boilers using alternative methods. They were only of marginal benefit and still required a large amount of maintenance – not to mention chemical treatments. Management then decided to trial Hydropath’s patented water treatment technology; "We installed the Hydroflow C60 three months ago. Before the installation, we opened the heat exchanger and saw that the tubes were scaled. We opened the heat exchanger after three months and we could not believe how clean it was inside".

The technology works by randomly inducing varying electric fields into the water, which propagate through the entire plumbing system. The result is the production of nuclei everywhere in the water system. When the water is heated, the hard water salts, which usually deposit as encrusting limescale on the surfaces, grow in suspension and are washed away in the flow. The electric field treats the water both up and down stream and is transmitted into the central heating system to

treat the primary water. The treated water is normally able to dissolve existing scale in just a few weeks.

The management now bypass the water softener and have stopped using chemical additives to let the Hydroflow unit take care of the heat exchanger. They intend to use Hydropath technology for all the boilers and heat exchangers on this site and in other locations undertaking maintenance.

Hydroflow is a very compact unit designed for "maintenance free" operation; it is non-intrusive and works on all types of pipes. The range of products covers all pipes for residential purposes and five commercial 'C range' models designed for much larger systems such as hotels, nursing homes, office blocks, health clubs, factories etc. The commercial products cover pipes sizes from 2" - 8" with larger sizes to special order.

For further information you can visit www.hydropath.com or call (0115) 986 9966.

Latest Construction News

23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
23/07/2026
Galliford Try has won a £47.5m contract from Thames Water to deliver the Camberley Sewage Treatment Works (STW) Flow Compliance scheme, aimed at improving performance, strengthening resilience and ensuring environmental compliance at the facility. The programme will boost flows through the inlet wo
Read More
23/07/2026
The Engineering Construction Industry Training Board's (ECITB) Project Management Steering Group (PMSG) has unveiled a new e-learning academy to strengthen project management capability across the engineering construction industry (ECI). Hosted on ECITB's award-winning Learning Experience Platform
Read More
23/07/2026
Baroness Smith of Malvern met key stakeholders and secondary school students at a major careers fair organised by All Together Cumbria, before taking part in a special summit focused on tackling the number of young people not in education, employment or training (NEET) in West Cumbria. The festival
Read More
23/07/2026
The Federation of Master Builders (FMB) has welcomed a trio of Cabinet appointments, arguing they offer a chance to speed up housing delivery, ramp up home retrofit and back construction SMEs. The organisation pointed to Angela Rayner becoming Housing Secretary, Matthew Pennycook’s elevation to Cabi
Read More
23/07/2026
McLaughlin & Harvey has secured a contract valued at more than £100m to deliver a new combat air facility for Rolls-Royce in Bristol. The site will accommodate research, manufacturing and assembly, creating capacity for new product development to support the future of air combat. Construction is ex
Read More
23/07/2026
GRAHAM has delivered a 90-metre, 150-tonne pedestrian, cycle and equestrian bridge over the A10 in Cambridgeshire, creating a traffic-free route between Waterbeach New Town, Cambridge Science Park and the city centre. Commissioned by developer Urban&Civic as part of the Waterbeach New Town scheme,
Read More
23/07/2026
The Good Eco Group has installed its long-life, energy-efficient G5 LED Battens into CrossFit Perpetua, a dedicated, world-class hybrid gym that provides a CrossFit training programme that builds strength and conditioning through extremely varied and challenging workouts. Situated in the railway arc
Read More
23/07/2026
MCI Developments, a subsidiary of Keepmoat, is set to deliver 44 affordable homes off Hardman Avenue in Rawtenstall in partnership with Mosscare St Vincent's Housing Group (MSV). The scheme, approved in full by Rossendale Borough Council earlier this year, will provide a mix of one, two and three-b
Read More
22/07/2026
Kier has been appointed to the new YORhub YORbuild Major Works 2 framework, worth £1.5bn, enhancing its capacity to deliver major public sector projects across Yorkshire and the Humber, the North East and neighbouring areas. The framework provides access to substantial building schemes for eligible
Read More
Pro Structures LtdBRICOFLOR UKLakeside HireSlurryChampCAN Geotechnical LtdAlpha Air Ventilation Supplies LtdButser Rubber Ltd (Rubber Moulders)Advanced Hydraulics LtdChannel Engineering LTDPolymer Compounders Limited