Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

16/07/2026

Fire And Acoustic Seals Launches First RIBA-Approved CPD Seminar

Construction News Image

In today's increasingly regulated construction environment, clarity in fire protection specification is no longer optional — it is essential.

Following the Grenfell tragedy and subsequent regulatory changes, architects, consultants and designers now carry greater responsibility for ensuring that products are suitable for their intended use and compliant with fire safety requirements.

Specifiers must understand a range of critical factors, including:

• Product limitations

• Tested applications

• Compatibility with surrounding systems

• Fire classification requirements

• Regulatory obligations

• Installation tolerances

To support the professional development of architects and specifiers, Fire and Acoustic Seals (FAS) has launched its first RIBA-approved CPD seminar: The Importance of Sealing the Linear Gap Around Fire Doorsets .

The one-hour seminar provides a comprehensive overview of the role sealing systems play in passive fire protection. Attendees will gain insight into fire testing standards and forthcoming industry changes, compliant product solutions, specification considerations, and the importance of correct installation and detailing.

-- Advertisement --
hss

Participants who complete the seminar will receive a CPD point towards their ongoing professional development.

The seminar addresses three of the ten mandatory RIBA CPD core curriculum topics required for Chartered Members’ annual 35-hour CPD obligation:

• Legal, regulatory and statutory compliance

• Design, construction and technology

• Health, safety and wellbeing

The launch of the CPD builds upon the wider programme of installer training sessions and toolbox talks already delivered by the FAS team.

Paul Gilbert, Head of Technical at Fire and Acoustic Seals, commented:

“We recognise that safe outcomes depend on people as much as products, which is why we have developed this CPD-accredited learning for specifiers.

We have focused on the linear gap around fire doorsets because this is one of the most common failings identified by fire door inspectors. Specifiers need to understand how to identify compliant and appropriately tested products that will perform correctly within fire doorsets in the event of a fire.

We also wanted to provide greater clarity around the relevant regulations affecting these products, as well as forthcoming changes expected over the next few years.

The initial response has been extremely positive, and I’m personally looking forward to delivering this CPD to architects, specifiers and other industry professionals over the coming year as part of our commitment to supporting safer specification, installation and compliance across the construction industry.”

How to Book

The new RIBA-approved seminar is available in face-to-face, online and on-demand formats via the FAS website Learning Hub.

It can also be booked through NBS Source and the RIBA CPD Providers Network website.

Fire and Acoustic Seals have an extensive product range in stock on next-day delivery service.

Visit www.fireandacousticseals.co.uk to find out more or to speak to one of the team.

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Lakeside HireBRICOFLOR UKPro Structures LtdPatio Black Spot Removal Company LtdDarran Construction Services LtdFalcon Tower Crane Services LtdAbbey Joinery & Carpentry JerseyFarrimond MacManusGates and Fences UkVentx