Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

07/04/2026

Hygiene And Acoustic Standards Delivered For Alhambra Centre, Barnsley

ARCHITECT: James Totty Partnership, LOCATION: Barnsley, Yorkshire.

​The Alhambra Centre in Barnsley, once a shopping centre, is undergoing a major transformation into a town centre health hub. This redevelopment aims to alleviate growing pressures on Barnsley Hospital by providing easily accessible healthcare services in a more central location. To support this transition, the interior design required a ceiling solution that met rigorous hygiene and acoustic standards while delivering strong aesthetic impact.

CHALLENGE

The project team faced several key challenges in transforming the Alhambra Centre into a functional and welcoming health hub. Aesthetic appeal was one of the top priorities, as the space required a fresh, modern look with a visually impactful ceiling design that would not only impress visitors but also create a calming and visually comfortable environment or all users.

Hygiene compliance was equally important. Given the building's new role as a healthcare facility, all materials, including ceiling systems, needed to meet strict hospital-grade hygiene standards to ensure a safe and sanitary environment for patients and staff.

Acoustic performance also had to be carefully considered. A calm, quiet atmosphere is essential in healthcare settings, especially in waiting areas and treatment rooms. The team needed a ceiling solution that could help manage sound effectively to promote patient comfort and well-being.

Lastly, service integration and accessibility presented a practical challenge. The ceiling system had to accommodate complex mechanical and electrical installations while still allowing easy access for future maintenance, ensuring long-term functionality without compromising design.

-- Advertisement --
hss

SOLUTION

Following a CPD session with Zentia and a review of relevant case studies, the architectural team, James Totty Partnership, selected a range of Zentia ceiling solutions to address the project’s diverse and complex requirements.

In the reception and waiting areas, the architect envisioned a bold, eye-catching ceiling feature to make a strong first impression. They opted for Sonify Curved Baffles in a mixture of green and black, installed on the patented Sonify Create grid system. This combination not only delivered the striking visual impact they were after, but also provided Class A sound absorption to ensure patients would be in an acoustically comfortable space.

For the circulation spaces, the team chose Prestige SL2 Planks. These were selected for their modern, streamlined appearance and, importantly, their ease of accessibility. In areas with frequent foot traffic and the need for ongoing service access, these planks offer a practical and efficient solution that supports long-term maintenance without compromising the aesthetic.

In the clinical and utility areas, performance and hygiene were essential. The team specified Biobloc Acoustic tiles for treatment rooms and general medical zones, where sound control and cleanliness are essential. The Biobloc Acoustic tile delivers both excellent sound absorption, and compliance with hospital-grade hygiene standards, such as the Health Building Note 00-10 Part B: Walls and Ceilings, due to its additional coating that actively inhibits the growth of micro-organisms.

For high-moisture environments such as shower rooms, Hydrabloc was chosen for its 100% Humidity Resistance (RH), water resistance, and easy-clean properties, ensuring both durability and safety in demanding conditions.

However, Zentia's involvement did not end with supplying products. The team delivered a full Sonify 3D Studio design service, working closely with the architects to bring the ceiling vision to life. In addition, Zentia collaborated with main contractor's O&P Construction and installers JR Whinfrey Ltd to provide detailed system walkthroughs, support with quotations and order planning, and on-site guidance during installation to ensure a smooth project delivery.

The redesigned Alhambra Centre is set to become a welcoming, efficient health hub with ceilings that do more than cover the space - they define it. With bold design statements in public areas and robust technical performance in clinical zones, Zentia’s ceiling systems have helped ensure the redevelopment meets both functional demands and architectural ambition.

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Pro Structures LtdLakeside HireBRICOFLOR UKMulti-Hire Power Tools Ltd.Jarvis Scaffolding LtdCarcinus LtdGunning Heating Products LtdInterior 360MPC Services (UK) Ltd.Insulation Store Online