Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

24/03/2026

Full Planning Bid Submitted For Plymouth Civic Centre Revamp

Plymouth's plans to breathe new life into the Civic Centre have reached a key stage, with a full planning application now lodged.

The scheme is intended to anchor the wider regeneration of the city centre by combining a new City College Plymouth campus in the podium and lower floors with homes in the tower, bringing city centre living into an iconic building.

City College Plymouth plans to convert the lower floors and basement into a Blue-Green Skills Hub training up to 2,000 learners each year across around 60 courses, spanning apprenticeships, higher education and adult skills programmes.

The focus is on supplying skilled people of all ages to sectors including marine engineering, renewable energy and sustainable construction, with a mix of educational and open spaces at podium level designed to inspire learners.

At street level, the former reception would become an open, welcoming public space linked to the city, featuring a careers hub, a sustainable bistro and restaurant, a wellness spa and a digital zone with AR and VR. Below that, the former basement would be reimagined as a lively education area with six technical workshops, while the first floor would provide classrooms for formal teaching.

-- Advertisement --
hss

Above the campus, 144 one- and two-bedroom apartments are proposed, introducing a type of compact city living not previously available in Plymouth. The design balances the building’s structure and heritage with modern standards for tall buildings, retaining the exposed concrete ‘waffle’ ceilings revealed during strip-out to create a contemporary interior.

Revisions from the original consent include a new stair and lift to meet the latest fire regulations; apartments replanned to satisfy national space and accessibility standards and an updated housing mix; greater retention of the existing structure to enable college use at podium levels with clear separation of uses; more active frontages at lower ground level and along the façade; mechanical ventilation for the new homes; a heritage-sensitive approach to replacing the east and west façades; a new stair and lift serving the podium bridge; and exploration of options for full public access to the rooftop.

Public realm improvements are also proposed, with re-landscaping around the Civic Centre to create welcoming, accessible spaces with new planting and seating, and refurbishment of the pond beneath the link connecting the tower and the Council House.

Councillor Mark Lowry, city centre champion, said: "I am so excited to get to this point. It's a huge undertaking, but we believe it is worth it. The Civic was symbolic of the city's post war regeneration and it is playing a leading part in our new vision for the city centre."

Planning officers will now scrutinise the roughly 1,000-page application and produce a report with their recommendations.

Current confirmed funding totals £47,486,361 from a range of public sources, including the Future High Streets Fund, corporate borrowing within the Council’s capital budget, Levelling Up Fund Round 3, and £18,386,278 from Homes England’s Brownfield Infrastructure and Land Fund. This will deliver the shell and core works, with City College Plymouth and a residential developer to fund the subsequent fit-out of the college and homes respectively.

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
BRICOFLOR UKLakeside HirePro Structures LtdConcept Distribution LtdMeadowson LtdLondon Sash Windows & Doors Ltd55 FixingsArchitile LtdArchitectural Glass Artworks Ltd (Andrew Moor Associates)Glazing and Repairs Window and Door Specialists