Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 147,682 companies....

Construction News

04/02/2026

Are Temporary Buildings Rateable? What You Need To Know

When investing in a new facility—whether it's a hangar, warehouse, or workshop—business rates are a key cost consideration.

But how are these rates applied to temporary or semi-permanent buildings like ours?

Some providers suggest their structures are exempt from business rates due to being freestanding or portable. Rubb buildings are engineered for performance. Not freestanding, not disposable, and designed to meet long-term operational needs.

So, how does this affect their rateability?

Are Rubb buildings rateable?

In many cases, yes. Business rates in the UK apply to most buildings used for commercial purposes, regardless of whether they’re permanent or temporary. That said, rateability is ultimately assessed by the Valuation Office Agency (VOA), based on how the building is used, how long it’s in place, and how it’s constructed.

Rubb buildings are:

• Anchored to foundations or groundworks

Fully engineered to meet wind and snow load requirements

•Designed for durability, with many in service for decades

Because of this, they are generally considered rateable structures—but there can still be significant advantages when compared with traditional buildings.

A Rubb building may still attract lower rates

Although Rubb buildings are not freestanding, they are still relocatable and designed for efficient installation and demounting. These features may reduce their assessed rateable value compared to a conventional building of similar size, particularly if:

-- Advertisement --
hss

• The structure is in use for a defined, temporary period

• It is not connected to all permanent services (e.g. electricity, water, drainage)

• The use is for a non-commercial or seasonal activity

• The building's presence does not materially enhance the land’s long-term value

In practice, many Rubb buildings have received reduced business rate assessments compared to traditional steel or brick-built alternatives, typically due to their demountable nature and the intended temporary or semi-permanent usage outlined at the planning stage.

The VOA may take these factors into account when determining business rates, leading to lower rateable values and reduced ongoing costs for the client.

Community and sports use: rate relief options

If a Rubb building is used by a charity, not-for-profit group, or Community Amateur Sports Club (CASC), it may qualify for business rates relief. These organisations can often receive:

80% mandatory relief (for charities or CASCs)

Up to 100% discretionary relief, depending on the local authority

So while the building may still be rateable, the actual rates payable could be minimal or zero.

Rubb vs. 'freestanding' temporary buildings

Some temporary building providers describe their structures as freestanding and non-rateable. This often reflects short-term, low-load designs that don’t offer the strength, safety, or longevity of a Rubb solution.

By contrast, a Rubb building is:

Permanently anchored, not freestanding

Built to BS EN standards for structural loads

Capable of supporting overhead cranes, HVAC systems, and Thermohall® insulation

Often used for decades, even if originally installed for a short-term purpose

While our buildings are typically rateable, they offer far greater operational value, lifespan, and return on investment.

Case by case

Business rates are assessed individually by the VOA, based on site-specific factors like use, duration, and construction. While a Rubb building may not be exempt, its rateable value can still be favourable—especially when compared with conventional builds.

We recommend consulting a business rates advisor or your local authority when planning your project, and we’re happy to support that conversation with detailed building specifications.

Rubb structures offer fast deployment, robust performance, and long-term value. If you’re assessing the cost of a new building—including business rates—reach out to our team for a chat.

Latest Construction News

25/06/2026
An £11 million programme at Garforth wastewater treatment works in Allerton Bywater has been completed, delivering cleaner treated water to Sheffield Beck. Yorkshire Water, working with its contractor Mott Macdonald Bentley, said the scheme will significantly cut the phosphorus returned to the beck
Read More
25/06/2026
McLaughlin & Harvey has been named winner of Best New Building at the 2026 Construction News & Property Week Life Sciences, Tech & Research Clusters Awards. The accolade recognises Trinity by Breakthrough, a cutting-edge biotech research facility delivered by the contractor. The judges said the pr
Read More
25/06/2026
National Grid has switched on 44km of newly built overhead power lines from Sandford to Seabank, marking a major step forward for the Hinkley Connection Project. Once fully complete, the scheme will deliver low‑carbon, homegrown electricity to around six million homes and businesses across th
Read More
25/06/2026
Two ornate gateways in Wisbech town centre have been removed on a temporary basis for safety repairs and restoration following an inspection. The steel 'High Street' and 'Market Place' arches, installed more than 30 years ago as entrances to the historic centre, were taken down on Wednesday 23 June
Read More
25/06/2026
As 47% of UK managers say the current heatwave is negatively affecting productivity, Essential Site Skills is urging employers to look beyond lost output and treat extreme heat as a serious workplace safety risk. •
Read More
25/06/2026
Kier has promoted Barry Jupp to managing director of its Highways business within the Infrastructure division, effective 1 July 2026. He will oversee the delivery of essential road construction and maintenance services across the UK, leading an around 2,000-strong team. His priorities include supp
Read More
25/06/2026
FIS has launched a short, targeted e-learning module. The Building Safety Act Wales 2026 to help contractors, designers and specialists prepare for significant changes to building regulation
Read More
25/06/2026
When an emergency strikes, every second matters. The Dräger CF15 Escape Set is a dependable self-contained breathing apparatus (SCBA) designed to provide up to 15 minutes of clean, breathable air, helping individuals escape quickly and safely from hazardous environments filled with smoke, toxic gase
Read More
24/06/2026
McLaren Construction (Midlands & North) has completed a flagship industrial and logistics facility at Panattoni Park Swindon, marking a key step in transforming the historic brownfield location into a high-quality logistics and employment hub for the South West. The 545,000 sq ft speculative scheme
Read More
24/06/2026
Marick Real Estate has announced the appointment of Watkin Jones Group as the construction partner for the redevelopment of 38-40 George Street into "Wilde Oxford." The project will deliver a new design-led, 145-unit lifestyle aparthotel featuring dedicated social spaces. The development also incor
Read More
BRICOFLOR UKPro Structures LtdLakeside HireSmartStruct LtdMartin UK Roofing Systems LtdPolarwall LtdButler SignsRKP Access PlatformsB W M GroundworksNoiseAssess Acoustic Consultancy