Residents of Lymington are set to benefit from enhanced flood defenses following critical maintenance at the town's floodgate on Toll Bridge Road this November.
The Environment Agency will replace the floodgate's sill plate, which has loosened over time. The new concrete structure is designed to be more durable and better withstand heavy traffic, ensuring continued protection for homes and businesses for years to come.
In addition, the team will repair the valve system that controls tidal water flow, damaged during last year’s storms, and address sunken road surfaces behind the floodgates.
Work is scheduled to begin on Monday, 10 November, and is expected to conclude by Saturday, 15 November. During daytime hours, the road will be reduced to a single lane controlled by traffic lights, while overnight closures from 7 pm to 7 am will be in place. Residents are advised to expect delays and plan journeys accordingly. An interactive roadworks map provides further details.
Artur Podsiadly, project manager at the Environment Agency, said: "We understand this work will cause inconvenience, and we apologise for the disruption. We’ve worked closely with Hampshire Highways to minimise the impact as much as possible, including completing the work within six days.
"These repairs are essential to keep Lymington's flood defences working effectively. When w'’re finished, residents will have a stronger, longer-lasting system protecting their community."
The maintenance marks the first of two planned improvement phases. The second phase, involving the replacement of tidal gate mechanisms, is slated for early 2026, with further details to be announced closer to the time.
UK
Ireland
Scotland
London











