Network Rail has announced it is to carry out essential improvement work to enhance the line between Poole and Dorchester.
Engineers will strengthen a railway embankment in Hamworthy and upgrade drainage at the Poole sidings to reduce flood risk and improve long-term reliability, with buses replacing trains between Saturday and Friday 21 November while Network rail carries out essential maintenance.
During this period, engineers will strengthen a railway embankment in Hamworthy and improve drainage at the Poole sidings to help protect the railway from flooding and improve long-term reliability.
Further west, work will take place to renew the wheel timbers—the long blocks that support the tracks—on the River Frome bridge near Wool. These will be replaced with Fibre-reinforced Foamed Urethane (FFU) alternatives, extending the life of the structure. Engineers will also complete footbridge improvements at Wool station.
Changes to train services:
• Saturday 15 and Sunday 16 November 2025: Buses replace trains between Bournemouth and Dorchester South
• Monday 17 to Friday 21 November 2025: Buses replace trains between Poole and Dorchester South
UK
Ireland
Scotland
London











