Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is the first of its kind outside the trial site in Anglia, marking a significant advancement in railway technology. Additionally, the outdated level crossing barriers were replaced with modern electric ones, which lower and raise much faster, enhancing safety and efficiency for all users.
The upgrade improves rail reliability and ensures a safer experience for both pedestrians and motorists.
Amelia Fordyce, scheme project manager for Network Rail's Eastern region, said: "We are delighted that the renewal work at Driffield Skerne Road level crossing is now complete and was done ahead of schedule.
"This project was vital and has replaced decades-old equipment to greatly enhance the reliability of the rail network and long-term safety.
"We would like to thank passengers, businesses and residents in the local community for their patience and understanding while this work was carried out."
UK
Ireland
Scotland
London











