Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,484 companies....

Construction News

19/12/2024

New Images Unveiled Of Stockton Waterfront Project

Construction News Image
The latest images of the transformational Stockton Waterfront urban park have been revealed, marking one year since work began on the project.

Led by Esh Construction and commissioned by Stockton-on-Tees Borough Council, the development is a cornerstone of the Council’s 25-year vision to reshape the town. Over the past year, the project has created 683 weeks of full-time employment for Stockton residents and delivered 88 hours of community volunteering through the Esh site team.

Once complete, the urban park will feature unique play areas, versatile event spaces, and a land bridge structure connecting the High Street directly to the River Tees. The bridge will span Riverside Road, offering seamless, uninterrupted access to the riverside for residents and visitors alike.

Councillor Nigel Cooke, Cabinet Member for Regeneration and Housing at Stockton-on-Tees Borough Council, said: "It's been so exciting to see the physical transformation of the urban park's construction site over the last year.

"This is an important project which will breathe new life into Stockton High Street, but the scale of change here will also be felt across the entire Borough.

"Stockton Waterfront is set to be the catalyst for further regeneration work across Central Stockton and North Thornaby. We are looking to build on this success to create vibrant places fit for future generations, mixed-use neighbourhoods and a stronger town centre with increased footfall through a Blueprint for the next 25 years."

With ground broken on the major civil engineering project in December 2023, Esh has clocked up more than 65,500 (65,526) hours on site. To lower the existing A1305 dual carriageway beneath the park, 16,000m3 of earth has been excavated and retaining structures rising up to 7.8 metres high have been constructed.
-- Advertisement --
hss



A significant piling operation – involving the installation of 320 rigid inclusion piles – was undertaken to support over 300 metres of reinforced earth retaining walls faced with blockwork and reinforced concrete walls. All of which will border the Riverside road to allow the realigned carriageway to pass under the land bridge, creating a seamless link to the riverside.

Running through the middle of the urban park, the land bridge will open up the High Street and connect it to the River Tees, supporting business growth and encouraging more shops, cafes and restaurants to open for residents and visitors to avail of.

Work on the Riverside area, in the lower section of the urban park, started in October, paving the way for a new footway along the river towards the amphitheatre, with garden spaces being created on the eastern side of the carriageway.

Divisional Director at Esh Construction, Steven Garrigan, said: "After over a year of collaboration with Stockton-on-Tees Borough Council, we are proud to be delivering a development that will serve as an iconic and transformative addition to Stockton Town Centre.

"This project reflects our commitment as a local contractor to create a lasting value for the communities we serve. Through the last 12 months our project team has made great strides in developing this site, while our Social Value team has been working in the local community through a range of volunteering and donation initiatives, while directly engaging students in multiple employability and careers-led workshops.

"Stockton is undergoing an extraordinary transformation, and we are proud to be contributing to this journey alongside Stockton-on-Tees Borough Council."

By re-using 14,608 tonnes of clay on site, Esh has made a saving of approximately 104 tCO2e, in comparison to using imported fill, while more than 7,000 tonnes of waste have been diverted from landfill.

As work continues into 2025, the upper park – namely the Finkle Square and the Oval Lawn areas – will start to take shape.

Finkle Square will serve as an entry point to the completed urban park and could play host to events and markets as well as seating and heritage opportunities. A large-scale play area will be the centre point for the park along with a series of play and water features.

The Oval Lawn will provide a large accessible, flexible space capable of hosting events, with an impressive amphitheatre offering a large, curved seating terraced area which leads down to a central stage area on the riverside. An accessible ramp route is also integrated between terraces, along with planting and water features.

Procured via North East Procurement Organisation (NEPO), Esh is working in partnership with Ryder Architecture and Billinghurst George & Partners to deliver the scheme.

Latest Construction News

11/07/2025
Story Homes has submitted a full planning application to South Ribble Borough Council for a proposed new residential development in Longton, aiming to build on the success of its nearby Longton Grange scheme. With the majority of homes now sold at Longton Grange, the developer is looking to meet co
11/07/2025
Essar Energy Transition (EET), through its subsidiary EET Property Limited, has completed the acquisition of Thornton Science Park. The 66-acre site includes purpose-built laboratories, industrial facilities, and office space, and is set to play a central role in EET's ambition to create one of Eur
11/07/2025
Families are preparing to move into four newly completed houses for affordable rent at the Malthouse Meadows development in West Sompting, Adur. The latest handover marks a key milestone in the delivery of high-quality, energy-efficient homes aimed at addressing local housing needs. The four fami
11/07/2025
Galliford Try's project team at the Syngenta manufacturing site in Huddersfield has been shortlisted in two categories at the 2025 Constructing Excellence (CE) Yorkshire and Humber Awards, celebrating the success and resilience of a long-standing partnership spanning over two decades. The team has
11/07/2025
Cambridgeshire County Council has appointed Morgan Sindall Construction to deliver a new secondary school at the heart of the Alconbury Weald development, continuing its investment in the region's educational infrastructure. The new school, named Alconbury Weald Church Academy, will be run by the D
11/07/2025
Passengers and residents in Stone, Staffordshire, are being urged to prepare for a £7 million-plus package of railway upgrades set to improve safety, performance and long-term reliability on the West Coast Main Line. The work, scheduled to take place during the summer school holidays, will include
11/07/2025
A ceremonial tile signing has marked a major milestone in the restoration of the historic Pippbrook House, as roof-level works near completion on the Grade II* listed building in Dorking. Chair of Mole Valley District Council (MVDC), Councillor Roger Adams, led the event, joined by a host of guests
11/07/2025
ACS Construction Group has been appointed Principal Contractor by GE Vernova for a major infrastructure expansion at its Stafford HVDC Transformers facility, part of the company’s drive to support global decarbonisation through advanced transformer technology. ACS commenced with the Test Supply Bui
10/07/2025
Vistry Group has agreed two major deals with housing provider Abri to enable the delivery of almost 200 affordable homes across Hampshire, marking a significant step forward in addressing local housing needs. In Funtley, near Fareham, Vistry has completed a simultaneous land acquisition and forward
10/07/2025
Caddick Construction has officially completed its first Midlands project with the handover of Mansion House, a six-storey residential development comprising 58 new apartments, to joint venture partners Urban Splash and Places for People. Located on the 43-acre Port Loop island alongside Birmingham
Stuart CanvasLakeside HireEfco UK LtdAqua Direct LtdEasy Steel BuildingsPier (UK) LtdStainless & Aluminium Services LtdPF ModularLeemark Spinnings LimitedBTE Plant Sales