Caddick Construction has chosen G&H to deliver a mechanical, electrical and public health (MEP) design and build package to Pudsey Sixth Form College in Leeds.
Scheduled to open at the start of the 2025/26 academic year, the new teaching block will cater for 600 higher education students studying A-Levels, vocational courses, and GCSEs. It will provide much-needed sixth form space for the increasing number of 16-18-year-olds in the city.
G&H's 20-strong team, including six apprentices, will commence work on the college in February, incorporating energy-saving features such as air-source heat pumps and photovoltaic (PV) panels to ensure the building achieves top marks in its BREEAM* sustainability compliance rating and its Building Regulations UK Part L (BRUKL) certificate.
In addition, G&H will provide heating, ventilation, air conditioning, public services, commercial kitchen services, and building management systems (BMS) to provide a comfortable environment for the students to thrive.
As well as Pudsey Sixth Form College, G&H is delivering two further MEP contracts for the Luminate Education Group. In collaboration with New Way, G&H is improving specialist music and performing arts university, Leeds Conservatoire, with the upgrade of 165 radiators and the lighting, refurbished air handling units, installing a chiller, distributing new pipework throughout the building, and updating the BMS.
In 2025 G&H, in partnership with Caddick Construction, will also commence work on Harrogate College, delivering a MEP design and build package for a new teaching block and workshop.
Mohammad Choudhary, project engineer, G&H said: "We have extensive experience in the education sector, so the Luminate Education Group projects align perfectly with our expertise. It will be a privilege to work alongside Caddick Construction to deliver the Pudsey Sixth Form College, providing a sustainable building that offers a safe and comfortable environment for young people from Leeds and the surrounding areas to prosper."
Steve Ford, managing director for Caddick Construction Yorkshire and North East, commented: "Delivering new school places - whether primary, secondary or further education - requires efficiency and value for money, both of which are made possible through a high-quality and local supply chain. Caddick holds a strong 40-year legacy in Yorkshire, and during this time we’ve surrounded ourselves with a dedicated and highly skilled network of regional subcontractors. We’re pleased to have G&H on board to support the delivery of the new Pudsey College for our valued client, Luminate Education Group."
Construction News
28/11/2024
G&H Chosen To Deliver MEP Design And Build Package


06/05/2025
Scarborough Group International (SGI) has announced its vision for the next phase of development at Thorpe Park Leeds, outlining plans to introduce a major industrial and logistics hub, new urban apartments, and additional Grade A business spaces with supporting amenities.
Building on more than 25

06/05/2025
Kirklees Council has submitted updated plans for the refurbishment of the historic George Hotel in Huddersfield, proposing an increase in guest rooms while carefully preserving the landmark building's architectural and heritage features.
Working in partnership with architects and Historic England,

06/05/2025
Persimmon Homes has officially broken ground on its new Hawthorn Park development in Leominster, welcoming local councillors to the site to mark the start of construction.
The Deputy Leader of Herefordshire Council, Councillor Elissa Swinglehurst, and Councillor Allan Williams, who represents Leomi

06/05/2025
Engineering and infrastructure group Murphy has announced a strategic partnership with Australia-based Abergeldie Complex Infrastructure.
The deal will see Murphy take a 40% stake in Abergeldie, a move that strengthens both companies' capabilities and reflects a shared commitment to values-led infr

06/05/2025
Network Rail has completed a programme of emergency repairs to an embankment on the Brighton Main Line near Three Bridges, restoring full safety and stability to a key stretch of one of the country's busiest rail routes.
The repairs were carried out after a landslip occurred between Three Bridges a

06/05/2025
As the UK's new Online Safety Act brings strict protections for young people online, training provider Essential Site Skills latest blog highlights the wider impact these measures will have on safeguarding the workforce of tomorrow.
Click

06/05/2025
We decided to group these subjects into one page as they're all closely related. This information was updated in July 2019 and is accurate at time of writing.
Grade 1 Lowest
Intruders are expected to have little knowledge of the alarm system and may be restricted to a limited range of tool

06/05/2025
Looking for a standing stairlift in the UK? Read on...
Which manufacturers make stand-up stairlifts, who needs them, their benefits, and how much do they cost? Let's discover compact stand-on stair lifts for the elderly, people with joint problems or those with staircases too narrow to fit a tradit

06/05/2025
With over 1.4 million kilometres of underground services in the UK, underground cables, pipes, and services are hit and damaged every day, sometimes resulting in serious injury, the cost of repair, and a loss of business reputation.
This is mainly caused by operatives not being able to use cable av

06/05/2025
The max weight limit for a straight stairlift is 31 stone, or 197kg, however there's much more choice at 25 stone weight limit.
For curved stairlifts the max weight limit is 30 stone, or 190kg, however there's much more choice at 19 stone limit.
Overweight people with mobility issues can face esp