Costain has achieved a major milestone with new lanes on the M6 between junctions 21a and 26 now open to traffic.
National Highways has added an extra lane in both directions across the ten-mile stretch of the M6, from junction 21a to the Orrell interchange at junction 26 with the M58, to improve traffic flow.
The newly upgraded Warrington to Wigan section will run at a maximum of 50mph - with other interim safety measures in place - until work to calibrate technology, including stopped vehicle detection, is completed. The upgrade is then expected to fully open, with the 70mph maximum national speed limit, by next spring.
Alongside adding an extra lane in both directions, the upgrade has involved providing extra technology and safety enhancements, including stopped vehicle detection. This uses radar technology to alert National Highways’ control centre operators who can then close lanes with a red X signal, display modified speed limits and deploy traffic officers.
Costain has been the on-site partner for the scheme, leading the delivery of improvements on this key strategic route which carries around 120,000 vehicles a day between Lancashire, Merseyside, Cheshire and Greater Manchester. The scheme, which has already delivered a number of social value benefits and supported local institutions including Cleavley Community Forest Garden, Millbrook Primary School and Ashton Bears Rugby Club, will improve the lives of those in the region by reducing congestion and improving travel times, making journeys more reliable and facilitating economic growth in the North West.
Construction News
14/10/2024
Costain Opens New Lanes On M6


04/07/2025
JV North has announced the list of contractors and consultants appointed to its £500 million social housebuilding framework, which aims to deliver around 3,000 homes across the North West over the next four years.
The housing consortium, which includes 14 members, launched the procurement process i

04/07/2025
Work has officially started on preparing Eston Precinct for demolition, marking the first step in a major regeneration project led by Redcar & Cleveland Borough Council.
Esh Construction has been appointed to deliver the scheme, which will begin with the safe removal of asbestos and the soft strip

04/07/2025
The Secretary of State for Energy Security and Net Zero hasgranted development consent for the Mona Offshore Wind Farm.
The scheme, located in the Irish Sea, will deliver approximately 1,500MW of clean energy capacity and forms part of the Round 4 Offshore Wind Licensing Arrangements. The applicati

04/07/2025
The restoration of Chatham’s iconic Brook Theatre is officially underway, with the appointment of contractors to carry out the £21 million transformation of the 125-year-old building.
Originally opened in 1899 as Chatham Town Hall, the Grade II listed Renaissance-style landmark has served the commu

04/07/2025
Work to upgrade a flood-prone section of Stockbridge Road in Timsbury is set to begin later this month, as part of a joint project between the Environment Agency and Hampshire County Council to improve local flood defences.
Starting on 28 July, the five-week scheme will deliver vital improvements a

04/07/2025
Oldham's town centre regeneration has taken a major step forward, with planning consent now granted for all six sites earmarked for transformation through the partnership between Muse and Oldham Council.
The approval represents a significant milestone in the long-term vision to create a vibrant, in

04/07/2025
As temperatures soared during this week's heatwave, euroloo's innovative EcoWelfare units proved to be a game-changer on construction and outdoor sites across the country.
Designed with comfort and sustainability in mind, these multi-functional welfare units offer everything teams need to stay pro

04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments.
With a reputation for accuracy and reliability, Atlas

03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham.
This marks the first phase of development at the 227-acre site.
The scheme will deliver a range of purpose-built units from 4,820 sq ft

03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough.
Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive