Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

12/09/2024

Council Supports First Phase Of Mass Transit Scheme

Leeds City Council is supporting the first phase of West Yorkshire's mass transit scheme, in a report due to go before senior councillors next week.

The West Yorkshire Combined Authority is currently consulting on the first phase of its mass transit scheme, which would see tram routes created between St James’ Hospital and the White Rose office park and shopping centre, and between Leeds and Bradford.

A report to the Leeds City Council’s executive board, to be considered at its meeting at Civic Hall on Wednesday 18 September, states that the council recognises the 'strategic importance' of mass transit across Leeds and West Yorkshire in improving transport connections and accelerating economic growth and regeneration.

This includes 'unlocking of new housing growth opportunities across the city' and ‘bringing people within easier reach of jobs and opportunities’, along with connecting people with education, health and local centres in addition to social and leisure destinations in the city centre.

The report also states that mass transit 'will play a critical role in helping Leeds to be the city where you don’t need a car, encouraging mode shift from private car use to reduce congestion and meet the council’s carbon net zero targets'.

The combined authority's consultation options splits the possible mass transit route into three sections – Leeds city centre and South Leeds, which together make up the ‘Leeds Line’, and the ‘Bradford Line’.

-- Advertisement --
hss

There are four options for the Leeds city centre route, which would between St James’ Hospital and the River Aire at Victoria Bridge.

There are three options for South Leeds route, which would join the city centre route at Victoria Bridge and end at the White Rose Shopping Centre via either Holbeck and Elland Road or along the A653 Dewsbury Road.

The Bradford Line options would connect Leeds and Bradford using three different routes between either Stanningley or Pudsey, and either Armley or Wortley.

The report states the council’s preference for Leeds city centre route known as L1 via East Parade and Infirmary Street, connecting to the South Leeds route known as L6 which would travel via Elland Road, Elland Road Stadium and Ring Road Beeston to the White Rose site.

The report states that the council supports routes that connect to these destinations along with the universities, hospitals, existing housing developments and the Innovation Arc, and ‘offer opportunities to accelerate urban regeneration… and be a catalyst for wider change by helping to unlock brownfield development and placemaking that contributes to new housing delivery and economic growth’.

The report goes on to state that mass transit 'has the potential to radically change access to the south of the city and particularly the corridor comprising Elland Road, the football stadium, White Rose Office Park and White Rose Shopping Centre, and outer south Leeds, linking to growth points in Kirklees'. The report suggests that options which follow routes through Middleton similar to those in the previously-proposed New Generation Transport (NGT) scheme would be ‘sub-optimal’ compared to routes which connect to Elland Road, and previous ‘negative feedback’ about the NGT routes should be taken into account.

The report recognises the importance of improving connectivity between the two largest cities in West Yorkshire and the ‘clear regeneration opportunities for key settlements along the route’.

The council also wants to ensure that 'centres like Pudsey gain maximum benefit from the provision of an enhanced transport link' and supports improved connections between the city centre, Pudsey and Bradford.

However, the report does not outline a specific preference for any of the three Bradford Line options at this stage, stating that the council would welcome 'further conversations on the design development with WYCA to fully inform future considerations on a preferred route'. This includes understanding how any route would integrate and impact on the existing railway and Northern Powerhouse Rail proposals, how any disruption to local highways would be minimised, and how mass transit would serve communities along the route.

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Pro Structures LtdLakeside HireBRICOFLOR UKSteel Fencing LtdMacsalvors Plant Hire LtdAlpha RecruitmentSolarshade Window FilmsPeter Wragge Supplies LtdAutomation Controls (Belfast) LimitedLove Your Fence