Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,409 companies....

Construction News

29/08/2024

Fully-Functioning Bridge Prototype To Show Future Of Accessible Stations

A Network Rail-led consortium has constructed a full size, newly designed accessible bridge, with fully-operational lifts, to give constructors and clients the chance to "try before they buy" and see for themselves how quickly the modular design can be built.

The bridge has been on display in Kent for around a month, giving hundreds of railway colleagues the chance to use the bridge and properly see its scale.

Called AVA, the accessible bridge is designed to be more attractive for passengers, more reliable and easier to maintain than traditional designs. Built of stainless steel, it's designed to be long-lasting and doesn't need to be painted.

The first of the design to be built on the railway will be in Stowmarket, thanks to Greater Anglia, with the prototype giving a great idea of the scale and ease of use and installation. The modular design and plug-and-play lifts are designed to cut the time needed on site by over half, which is much better for passengers and neighbours.

AVA is part of the TIES Living Lab programme and was created by a consortium of Network Rail, Expedition Engineering, Hawkins\Brown, McNealy Brown, ARX and Walker Construction, with funding from Network Rail Research and Development and Innovate UK. The prototype was constructed by McNealy Brown in their Sittingbourne site.

Network Rail's head of buildings and architecture, Anthony Dewar, said: "You can look at models and drawings but there's nothing like using the lifts, walking the stairs and feeling the scale of the full-size bridge to make you realise how good this design really is. We want to give passengers better journeys and provide a railway that's better value for money, and to do that we need fresh designs like this.

-- Advertisement --
hss

"We want a bridge that is open and light so passengers feel secure, a bridge that looks modern, that makes people feel they're travelling on a modern railway, we want lifts to be more reliable, and our colleagues want a bridge that's easy to maintain, that can be installed more quickly and less disruptively… and also doesn't need painting every 25 years! That's why we have AVA."

Marek Dowejko, Greater Anglia's Asset Programme Manager, said: "The station received funding in 2019 for accessibility improvements under the Government's Access for All scheme as the only step-free way to cross the platforms currently is via the level crossing.

"Thanks to this revolutionary new style of bridge the scheme was affordable, and we have been able to use the Access for All funding efficiently and to the best outcome for passengers. We want everyone to be able to have a good journey with us and the plans for Stowmarket are going to make a big difference to people using the station."

Chris Wise, Senior Director at Expedition, the Lead Designer and structural engineer for the AVA Footbridge, said: "Of all the good things about AVA, to us at Expedition, the most exciting is how AVA signals the future of infrastructure manufacture. AVA demonstrates through its lean design, low carbon form how the industry can evolve: and not just in bridges and lifts. AVA changes the landscape: from customised one-off construction to automated, efficient and industrialised manufacture. Saving the taxpayer money, saving lifetime carbon, manufacturing infrastructure products that are super-fast to build, beautiful to use, optimising the process and the product every single time one is made. "

Designed by ARX, the company behind the movable roofs at Wimbledon, the lifts are designed to be easier to install than traditional designs and provide built-in resilience and redundancy, to avoid going out of service.

Darren Falkingham from ARX said: "A footbridge with lifts is vital for persons of reduced mobility, but only any good while the lifts are working. When a lift goes out of service, that's more than an inconvenience – it's enough to stop people from travelling altogether. We applied our knowledge of safe and reliable moving structures to engineer a lift with a strong, curved stainless steel door and two drive motors per lift. And for rapid installation, the plug-and-play design is fully tested and certified at our factory, with a complete lift module delivered to the station platform. In fact, when the prototype was built, the lift was operational in just five hours of arriving at site, start to finish."

Phil Webb from Walker Construction said: "A good design can be enough to make you feel good about your journey, to make you feel safe and welcomed, but a great design will do all that and be easy to install, cheap to maintain, and have the reliability to give people the certainty they can make their journeys hassle-free. We're so proud to see AVA standing tall and showing how good a bridge can be."

The AVA bridge will join other new designs, such as the Beacon and the Flow bridge in the Network Rail design standards catalogue for constructors. The first Beacon bridge was recently opened in Garforth not far from Leeds, with lifts set to join it shortly.

The Stowmarket AVA is set to be opened next year (2025).

Latest Construction News

23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
23/07/2026
Galliford Try has won a £47.5m contract from Thames Water to deliver the Camberley Sewage Treatment Works (STW) Flow Compliance scheme, aimed at improving performance, strengthening resilience and ensuring environmental compliance at the facility. The programme will boost flows through the inlet wo
Read More
23/07/2026
The Engineering Construction Industry Training Board's (ECITB) Project Management Steering Group (PMSG) has unveiled a new e-learning academy to strengthen project management capability across the engineering construction industry (ECI). Hosted on ECITB's award-winning Learning Experience Platform
Read More
23/07/2026
Baroness Smith of Malvern met key stakeholders and secondary school students at a major careers fair organised by All Together Cumbria, before taking part in a special summit focused on tackling the number of young people not in education, employment or training (NEET) in West Cumbria. The festival
Read More
23/07/2026
The Federation of Master Builders (FMB) has welcomed a trio of Cabinet appointments, arguing they offer a chance to speed up housing delivery, ramp up home retrofit and back construction SMEs. The organisation pointed to Angela Rayner becoming Housing Secretary, Matthew Pennycook’s elevation to Cabi
Read More
23/07/2026
McLaughlin & Harvey has secured a contract valued at more than £100m to deliver a new combat air facility for Rolls-Royce in Bristol. The site will accommodate research, manufacturing and assembly, creating capacity for new product development to support the future of air combat. Construction is ex
Read More
23/07/2026
GRAHAM has delivered a 90-metre, 150-tonne pedestrian, cycle and equestrian bridge over the A10 in Cambridgeshire, creating a traffic-free route between Waterbeach New Town, Cambridge Science Park and the city centre. Commissioned by developer Urban&Civic as part of the Waterbeach New Town scheme,
Read More
23/07/2026
The Good Eco Group has installed its long-life, energy-efficient G5 LED Battens into CrossFit Perpetua, a dedicated, world-class hybrid gym that provides a CrossFit training programme that builds strength and conditioning through extremely varied and challenging workouts. Situated in the railway arc
Read More
23/07/2026
MCI Developments, a subsidiary of Keepmoat, is set to deliver 44 affordable homes off Hardman Avenue in Rawtenstall in partnership with Mosscare St Vincent's Housing Group (MSV). The scheme, approved in full by Rossendale Borough Council earlier this year, will provide a mix of one, two and three-b
Read More
22/07/2026
Kier has been appointed to the new YORhub YORbuild Major Works 2 framework, worth £1.5bn, enhancing its capacity to deliver major public sector projects across Yorkshire and the Humber, the North East and neighbouring areas. The framework provides access to substantial building schemes for eligible
Read More
Lakeside HirePro Structures LtdBRICOFLOR UKBuckleys Mobile Crane ServicesQRMSJCB Insurance Services LtdAbility International LtdXMX LONDON LtdSurewire Electrical Services LtdB&L Shutters Ltd