Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

24/07/2024

Plans Approved To Refurb Wynyard Hall Spa

Plans to refurbish and transform the lakeside Wynyard Hall Spa designed by GT3 Architects have been approved by Stockton-on-Tees Borough Council.

Nestled downhill from Wynyard Hall overlooking the lake, the spa is set to undergo an extensive transformation to expand its offering with more wet spa facilities and treatment rooms, as well as increased accessibility for users.

The approved plans will see the existing ground floor building extended, along with the introduction of a new-look outdoor space. New features will include an infinity pool and ice plunge pool, two barrel saunas, fit pit seating areas alongside two hot tubs, and external terraces. A café area accommodating 40 covers will be positioned on the lower floor by the lake, fostering fluidity of movement with easy access to outdoor seating spaces.

The lower floor will also feature changing rooms and indoor spa facilities, which include a herbal sauna, steam room, frigidarium, experience showers, salt therapy room, and plunge pools. A new-build upper-level will house six single and one double treatment rooms, a manicure room, and relaxation rooms.

-- Advertisement --
hss

Anna Cumberland, senior architect at GT3 Architects, said: "It's fantastic to see the design proposals for Wynyard Hall Spa now approved and we very much look forward to getting work underway and bringing the new facility to fruition.

"Everything we do is rooted in people architecture, making sure that every design is truly focused on the people who will interact with the space, whether that be as a visitor or staff. In the case of Wynyard Hall Spa, this includes improving accessibility to allow more people to visit. Readdressing the entrance and circulation around the spa facilities, as well as re-aligning the building levels, introducing a lift, and adding accessible parking with an access route will all improve the spa in its current form.

"The designs combine the luxury aesthetic expected by visitors with a sensitivity to the overall setting, particularly with the listed nature of Wynyard Hall and its gardens, which date back to the early 19th century. A clean and simple exterior using a buffbrick base to the lower level creates this cohesion with the setting, while a timber finish with feature glazing to the upper level adds a contemporary element which frames views across the grounds and creates an all-important connection to nature."

Taking inspiration from Nordic spa experiences, the building orientation takes spa users on a journey through their visit using the contrast of hot and cold, and dark and light alongside a blend of tactile materials. Meanwhile, close consultation with the spa manager ensured that the operational functions of the spa were considered and would be efficient for staff, while also not impacting the visitor experience.

The design team for the approved plans includes Southern Green Landscape Architects, Portland Consulting Engineers, TGA Consulting Engineers, SAJ Transport Consultants, and ELG Planning.

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Lakeside HirePro Structures LtdBRICOFLOR UKSheridan Fire SystemsSheridan ConcreteConstruction MediaSW-HireConquip Engineering Group - Excavation Safety EquipmentOnetrace LtdJ W & A J Barrett Ltd