Developer HBD, part of Henry Boot, has selected Sheppard Robson to lead on the design of its second phase of the landmark Golden Valley scheme in Cheltenham.
The architecture practice will be responsible for the design of the next two buildings to come forward, with partner David Taylor leading a team of six. The firm joins the Golden Valley team alongside architect BDP, which is already well progressed with designs for the Innovation Centre and mobility hub, which will form the first development phase.
Golden Valley is one of the country's most high-profile schemes; a once-in-a-lifetime project at the heart of the UK’s National Cyber Strategy. Once complete, it will deliver 1million sq ft of commercial space and is expected to create 12,000 new jobs. The masterplan also includes the development of 1,067 low carbon homes nestled within green space and with various community services and amenities.
HBD is delivering the development alongside Cheltenham Borough Council and key local partners.
Planning permission for Golden Valley was submitted in October 2023 and a second application specifically for the National Cyber Innovation Centre will follow this summer.
Sheppard Robson will play a key role in meeting HBD's sustainability goals for Golden Valley, targeting BREEAM Excellent and EPC A ratings for office buildings. The practice will carefully consider the building’s fabric from the outside in, maximising energy efficiency and ensuring the space achieves best-in-class sustainability credentials.
Construction News
14/06/2024
Sheppard Robson To Lead On Design For Golden Valley Scheme


04/07/2025
JV North has announced the list of contractors and consultants appointed to its £500 million social housebuilding framework, which aims to deliver around 3,000 homes across the North West over the next four years.
The housing consortium, which includes 14 members, launched the procurement process i

04/07/2025
Work has officially started on preparing Eston Precinct for demolition, marking the first step in a major regeneration project led by Redcar & Cleveland Borough Council.
Esh Construction has been appointed to deliver the scheme, which will begin with the safe removal of asbestos and the soft strip

04/07/2025
The Secretary of State for Energy Security and Net Zero hasgranted development consent for the Mona Offshore Wind Farm.
The scheme, located in the Irish Sea, will deliver approximately 1,500MW of clean energy capacity and forms part of the Round 4 Offshore Wind Licensing Arrangements. The applicati

04/07/2025
The restoration of Chatham’s iconic Brook Theatre is officially underway, with the appointment of contractors to carry out the £21 million transformation of the 125-year-old building.
Originally opened in 1899 as Chatham Town Hall, the Grade II listed Renaissance-style landmark has served the commu

04/07/2025
Work to upgrade a flood-prone section of Stockbridge Road in Timsbury is set to begin later this month, as part of a joint project between the Environment Agency and Hampshire County Council to improve local flood defences.
Starting on 28 July, the five-week scheme will deliver vital improvements a

04/07/2025
Oldham's town centre regeneration has taken a major step forward, with planning consent now granted for all six sites earmarked for transformation through the partnership between Muse and Oldham Council.
The approval represents a significant milestone in the long-term vision to create a vibrant, in

04/07/2025
As temperatures soared during this week's heatwave, euroloo's innovative EcoWelfare units proved to be a game-changer on construction and outdoor sites across the country.
Designed with comfort and sustainability in mind, these multi-functional welfare units offer everything teams need to stay pro

04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments.
With a reputation for accuracy and reliability, Atlas

03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham.
This marks the first phase of development at the 227-acre site.
The scheme will deliver a range of purpose-built units from 4,820 sq ft

03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough.
Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive