Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

03/06/2024

Work Starts On First Phase Of Station Quarter Development

Work has started on the first phase of the Station Quarter public realm enhancement.

Work to remove a footbridge and install improved pedestrian facilities linking Station Quarter to the town centre has now commenced as part of the Station Quarter development.

The 48 metre long ageing footbridge, which has been in place since the mid 1980s, will be completely dismantled and removed as part of this first initial phase.

The work will be part of a series of extensive highway improvements associated with the Station Quarter development with this first phase delivered under an initial temporary road closure of Lawn Central from 3 June 2024.

Details about the next stages of work will be confirmed in due course.

-- Advertisement --
hss

Access to all car parks will be unaffected for the duration of the works and both vehicle and pedestrian / cyclist diversions will be in place.

The bridge removal is the first stage in improving connectivity between Telford train station and Telford shopping centre on Ironmasters Way, through to the Lawn Central junction, benefitting Telford and Wrekin residents and visitors.

Once the bridge has been removed, the scheme will proceed to the installation of new pedestrian facilities including a feature ramp and steps covering the sloped area between Lawn Central and the town centre which will improve accessibility to the Telford centre.

Further phases of work will follow on from this and comprise of:

Lawn Central carriageway improvements

A new signalised pedestrian crossing, with highway realignments and resurfacing as well as new paving to footpaths.

These works will consist of highway realignment and resurfacing. There are also plans for a tree lined avenue on either side of the adopted highway.

Further details on these works will be provided over the coming months.

Station Quarter is set to transform Telford town centre with new homes, a digital skills and enterprise hub called The Quad and public amenity spaces and squares.

The project is all part of a wider regeneration programme which is also seeing significant investment and transformation in other areas of Telford and Wrekin including Oakengates and Wellington.

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Pro Structures LtdBRICOFLOR UKLakeside HireCentre Line SurveysEnvirocycle GlasgowLiftworks LimitedArun AssociatesFreshBreeze Environmental LtdBESOrbis Protect