Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

20/05/2024

Plaque Unveiled At Barmouth Viaduct After Restoration Project

A heritage plaque has been unveiled on the pathway next to Barmouth Viaduct following the £30 million restoration of the viaduct.

Lord Hendy, chair of Network Rail, joined Ken Skates MS, Owain Pritchard, the Mayor of Barmouth, and members of the Network Rail project team to unveil the heritage plaque. Lord Hendy also officially named a class 97 locomotive after Rheilffordd Talyllyn Railway.

The restoration of the Barmouth Viaduct was completed in December 2023 following a four-year programme of work to restore the 156-year-old Grade II listed structure to its former glory and protect it for generations to come.

The Railway Heritage Trust played a key role in financing the installation of new handrails on the viaduct and contributed the plaque on the walkway adjacent to this renowned structure. Following the unveiling of the heritage plaque in Barmouth, Lord Hendy personally operated the Class 97 locomotive on its journey from Barmouth to Tywyn, where he officially named the locomotive.

The cast nameplates in the style of the Talyllyn Railway logo were revealed on the loco and are a testament to the close relationship between Network Rail and Talyllyn Railway as neighbours. Two mounted replicas cast from the same pattern were presented to David Ventry, Talyllyn Railway chair, and general managers, Liz Porrett and Lorraine Simkiss.

-- Advertisement --
hss

The Talyllyn Railway, often called "the railway with a heart of gold," was the world's first preserved railway. It started operating in 1865. In 1951, the Preservation Society took over the railway after the owner, Sir Haydn Jones, passed away. Today, old steam engines carry passengers from Tywyn to Nant Gwernol, a mountainous spot above Abergynolwyn.

Peter, Lord Hendy, chair of Network Rail, said: "I'm delighted to have unveiled the new plaque in Barmouth following four years of painstaking work by the project team to restore this iconic viaduct. I'm very fond of this railway and our Cambrian lines, and it always seemed to me a great shame that the dedicated locomotives on the Cambrian didn’t bear the names of railways with whom we have a very close connection.

"It's taken time and quite a lot of effort to get to the stage where we could name this Class 97 after the Talyllyn Railway, but having taken so long it seems particularly appropriate that it is on the cusp of the Talyllyn’s 75th anniversary as the first preserved railway in the world. And, unlike the previous locomotive named after the railway, this one will actually get to Tywyn!"

Tim Hedley-Jones, Director of the Railway Heritage Trust, said: "We were very pleased to work with Network Rail on the restoration of Grade II* listed Barmouth Viaduct. By reinstating handrails more in keeping with the architecture of the bridge we hope that those crossing it will better appreciate this marvel of Victorian engineering."

The Cabinet Secretary for North Wales and Transport, Ken Skates commented: "The restoration of the iconic Barmouth Bridge, the longest viaduct in Wales and a vital part of the Cambrian railway line, will provide a huge boost to our rail infrastructure, linking communities and encouraging more tourists to see this beautiful part of Wales, supporting the local economy."

David Ventry, Talyllyn Railway chair, stated: "We are grateful to Network Rail not only for Barmouth Bridge but donations of sleepers and assistance with relocating our standard gauge wagon. Life for heritage railways is becoming more difficult, as it is with bigger railways. But we are grateful for the support Network Rail gives us and the Heritage Railway Association which is much appreciated."

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Lakeside HireBRICOFLOR UKPro Structures LtdMASON U.K. LtdRapid Platforms LtdProtek ProductsMulti-Hire Power Tools Ltd.DGC Speed SprayA24 Security SystemsSeymour Dugan Interiors