Skanska has scooped a place on Network Rail’s North West & Central framework for Large Portfolio projects.
Large Portfolio projects cover the biggest value schemes in Network Rail's programme of works under the framework, ranging from £7 million to £200m.
The £490m framework covers Network Rail’s control period 7 (CP7), which runs from the start of April 2024 until the end of March 2029. The region includes the
North West, Central and West Coast South routes.
Large Portfolio projects encompasses multi-disciplinary civil engineering, building and railway systems work. This ranges from bridge construction, earthworks and geotechnical operations to improvements to existing or new stations, signalling, telecoms and electrification projects.
"We are delighted to have been appointed to the North West & Central Framework," said James Corker, Operations Director in Skanska’s infrastructure business.
"Our appointment builds on our relationship and successful delivery of projects through the CP5 and CP6 frameworks. This includes the SAS13 bridge replacement and enabling works at Euston for future HS2 services.
"We are now very much looking forward to working with Network Rail and our partners in delivering projects under CP7, while continuing to innovate and implement new ways of working that drive improved safety, efficiency, productivity and progress towards net-zero carbon."
Construction News
05/04/2024
Skanska Scoops Place On Network Rail's North West & Central Framework


30/04/2025
Construction has been completed on 368 build-to-rent apartments at West Bar in Sheffield, marking the successful delivery of the £300 million development's first phase.
The handover of the homes for occupation comes alongside the completion of a 100,000 sq ft office building and a new public squar

30/04/2025
United Living Group has announced that its subsidiary, United Living Energy Limited, part of the United Living Infrastructure Services (ULIS) division, has been appointed by Liverpool Bay CCS Limited (LBCCS), a subsidiary of global energy-tech company Eni, as one of the main contractors for a major

30/04/2025
Construction has begun on one of Birmingham's most eagerly awaited regeneration projects, Upper Trinity Street.
The development is a joint venture between Caddick Construction, Cole Waterhouse, Taurus Investment Holdings and Housing Growth Partnership.
The start of work on the Digbeth-based scheme

30/04/2025
Henry Boot Construction has been appointed to build a new environmentally friendly Maintenance Delivery Unit (MDU) for Network Rail in Barnetby, North Lincolnshire.
The project, located adjacent to Barnetby Station, will see the construction of a modern, two-storey 9,500 sq ft facility designed to

30/04/2025
Work is now underway on a new sustainable housing development in Salford, specifically designed for residents aged 55 and over.
The project, led by housing association Salix Homes in partnership with main contractor Caddick Construction, will deliver 69 energy-efficient homes on disused land at Ar

30/04/2025
Winvic Construction Ltd has revealed plans for its pavilion at UKREiiF 2025, announcing a new partnership with Leeds-based charity Zarach as part of its commitment to community impact and industry collaboration.
Titled the 'Winvic and Partner's Hub', the pavilion will serve as a space for thought l

30/04/2025
G F Tomlinson has officially broken ground on the University of Nottingham’s new hydrogen propulsion systems laboratory, a £5 million state-of-the-art facility set to transform clean energy research at the university's Jubilee Campus.
Scheduled for completion in December, the facility will support

30/04/2025
McLaren Construction Midlands and North has been appointed to lead the delivery of Plot 4 at the Matrix 49 industrial development in Avonmouth, Bristol.
The project is being undertaken on behalf of Equation Properties Ltd.
Work began on site in February 2025, with the 66-week construction programm

30/04/2025
Track and Wire Sawing at the Cotswold Canal.
As part of the lottery funded restoration project for the Stroud Valley Canal, we were approached to help with the restoration of Blunder Lock.
History of Blunder Lock
Blunder Lock was built in the mid-late 1770s and is part of the Eastington F

30/04/2025
Passengers at Leatherhead station are now benefiting from significantly improved accessibility following the completion of a £6.2 million upgrade led by Network Rail and funded through the Department for Transport's 'Access for All' programme.
The major enhancement includes the opening of a new ful