Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,409 companies....

Construction News

16/02/2024

Bulk Tankered Water For Construction

For many businesses, getting water from drinking water tanker suppliers is becoming the preferred option.

Whether you are looking to fill up a large office building or just need a few containers of drinking water for a smaller business, getting it from reputable water tanker suppliers can be the most cost-effective and efficient way to go about it.

Aqua Direct deliver on a just in time basis making sure your water arrives with you just when you need it.

We will provide delivery, full site installation and management of your water requirements.

We can regularly fill either on a long term or an ad-hoc one off basis.

We can leave our tankers and bowsers on site, enabling you to use the water at your convenience. We can drop and swap the tankers and refill the bowsers to suit your needs

-- Advertisement --
hss

24/7 contact with Aqua Direct Operations Manager in case of any changes or issues that may arise.

If your water supply is not yet installed or usable or too slow to keep your project timings on track, call Aqua Direct and we can deliver clean fresh water to your site.

Aqua Direct use a dynamic pricing structure which ensures we will provide you with a competitive price.

BULK TANKERED WATER FOR CONSTRUCTION

QUALITY ASSURED

Don't take risks – know the history/background analysis of your spring water.

We run rigorous quality assurance systems and an HACCP accountability plan to ensure our product reaches you in pristine condition. Aqua Direct hold a BRC ‘A’ accreditation Certificate and are regularly audited internally and externally.

Every tanker carries a certificate of sterility for the 29,500 litres of water. Two samples are taken for every load and sent to an UKAS Accredited Laboratory for testing.

Every load is fitted with tamper evident seals for each customer to remove on arrival to their site.

Aqua Direct's tankers can offload 29,500 litre of water within 30 minutes of arrival at your site with our integral pumps.

All our spring water tankers are bespoke and built specifically to ensure the best conditions for carrying our product to your facility using food grade 316 stainless steel for our tanker barrels.

Latest Construction News

23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
23/07/2026
Galliford Try has won a £47.5m contract from Thames Water to deliver the Camberley Sewage Treatment Works (STW) Flow Compliance scheme, aimed at improving performance, strengthening resilience and ensuring environmental compliance at the facility. The programme will boost flows through the inlet wo
Read More
23/07/2026
The Engineering Construction Industry Training Board's (ECITB) Project Management Steering Group (PMSG) has unveiled a new e-learning academy to strengthen project management capability across the engineering construction industry (ECI). Hosted on ECITB's award-winning Learning Experience Platform
Read More
23/07/2026
Baroness Smith of Malvern met key stakeholders and secondary school students at a major careers fair organised by All Together Cumbria, before taking part in a special summit focused on tackling the number of young people not in education, employment or training (NEET) in West Cumbria. The festival
Read More
23/07/2026
The Federation of Master Builders (FMB) has welcomed a trio of Cabinet appointments, arguing they offer a chance to speed up housing delivery, ramp up home retrofit and back construction SMEs. The organisation pointed to Angela Rayner becoming Housing Secretary, Matthew Pennycook’s elevation to Cabi
Read More
23/07/2026
McLaughlin & Harvey has secured a contract valued at more than £100m to deliver a new combat air facility for Rolls-Royce in Bristol. The site will accommodate research, manufacturing and assembly, creating capacity for new product development to support the future of air combat. Construction is ex
Read More
23/07/2026
GRAHAM has delivered a 90-metre, 150-tonne pedestrian, cycle and equestrian bridge over the A10 in Cambridgeshire, creating a traffic-free route between Waterbeach New Town, Cambridge Science Park and the city centre. Commissioned by developer Urban&Civic as part of the Waterbeach New Town scheme,
Read More
23/07/2026
The Good Eco Group has installed its long-life, energy-efficient G5 LED Battens into CrossFit Perpetua, a dedicated, world-class hybrid gym that provides a CrossFit training programme that builds strength and conditioning through extremely varied and challenging workouts. Situated in the railway arc
Read More
23/07/2026
MCI Developments, a subsidiary of Keepmoat, is set to deliver 44 affordable homes off Hardman Avenue in Rawtenstall in partnership with Mosscare St Vincent's Housing Group (MSV). The scheme, approved in full by Rossendale Borough Council earlier this year, will provide a mix of one, two and three-b
Read More
22/07/2026
Kier has been appointed to the new YORhub YORbuild Major Works 2 framework, worth £1.5bn, enhancing its capacity to deliver major public sector projects across Yorkshire and the Humber, the North East and neighbouring areas. The framework provides access to substantial building schemes for eligible
Read More
BRICOFLOR UKLakeside HirePro Structures LtdGarage Floors DirectScooter Store LimitedAmber Valley Stone LtdTJ Palmers MouldingLV Fuel ServicesNew Age ShuttersGB Specialist Access Solutions