Mission Street and BGO have secured resolution to grant planning permission from Oxford City Council for Phase 2 of their development in the West End of Oxford.
Known as Fabrica, and part of Mission Street’s joint venture with BGO, the new-build scheme will provide 180,000 sq ft of prime innovation real estate within a 10 minute walk from Oxford station and city centre. Designed by global architecture firm NBBJ, Fabrica has been designed to provide full flexibility of wet labs and offices across 5 floors in what will be a next-generation commercial sciences building.
The planning success comes in the same week as Practical Completion of Mission Street/ BGO's Inventa building which provides 65,000 sq ft of lab, office and collaboration space. The scheme provides large lateral floor plates separated by two “high-street” atriums serving providing 8,000 sq ft of collaboration and breakout space for occupiers
Inventa and Fabrica will provide the first commercial science schemes in the West End, Oxford’s central science district which is set to be transformed over the short and medium term in response to a shifting trend towards more sustainable, easily accessible urban science locations. Over 2 million sq ft of commercial and University science buildings have been identified within the West End pipeline with Nuffield College and Oxford City Council’s Oxpens scheme awaiting determination.
As part of a joint venture BGO and Mission Street are delivering over 1.5 million of lab and office space in key strategic UK locations, including the “ Golden Triangle” of Oxford, Cambridge and London.
CBRE and Bidwells are advising on the leasing.
Artem Korolev, CEO of Mission Street, said: "The decision to grant planning permission for Fabrica is a significant statement for the city of Oxford and for the Mission Street-BGO joint venture. This is the largest commercial Sciences scheme to gain consent in central Oxford and recognises the growing trend towards urban Science. The benefits for future occupiers are clear – proximity to Oxford train station and the city centre provides access to wider talent pools, ability to adopt sustainable travel methods, access to the amenities and cultural offerings of the city centre as well as the key anchors including the University. We're extremely excited to be at the forefront of this transformation of the West End."
Construction News
15/12/2023
Plans Secured For Fabrica


11/07/2025
Story Homes has submitted a full planning application to South Ribble Borough Council for a proposed new residential development in Longton, aiming to build on the success of its nearby Longton Grange scheme.
With the majority of homes now sold at Longton Grange, the developer is looking to meet co

11/07/2025
Essar Energy Transition (EET), through its subsidiary EET Property Limited, has completed the acquisition of Thornton Science Park.
The 66-acre site includes purpose-built laboratories, industrial facilities, and office space, and is set to play a central role in EET's ambition to create one of Eur

11/07/2025
Families are preparing to move into four newly completed houses for affordable rent at the Malthouse Meadows development in West Sompting, Adur.
The latest handover marks a key milestone in the delivery of high-quality, energy-efficient homes aimed at addressing local housing needs.
The four fami

11/07/2025
Galliford Try's project team at the Syngenta manufacturing site in Huddersfield has been shortlisted in two categories at the 2025 Constructing Excellence (CE) Yorkshire and Humber Awards, celebrating the success and resilience of a long-standing partnership spanning over two decades.
The team has

11/07/2025
Cambridgeshire County Council has appointed Morgan Sindall Construction to deliver a new secondary school at the heart of the Alconbury Weald development, continuing its investment in the region's educational infrastructure.
The new school, named Alconbury Weald Church Academy, will be run by the D

11/07/2025
Passengers and residents in Stone, Staffordshire, are being urged to prepare for a £7 million-plus package of railway upgrades set to improve safety, performance and long-term reliability on the West Coast Main Line.
The work, scheduled to take place during the summer school holidays, will include

11/07/2025
A ceremonial tile signing has marked a major milestone in the restoration of the historic Pippbrook House, as roof-level works near completion on the Grade II* listed building in Dorking.
Chair of Mole Valley District Council (MVDC), Councillor Roger Adams, led the event, joined by a host of guests

11/07/2025
ACS Construction Group has been appointed Principal Contractor by GE Vernova for a major infrastructure expansion at its Stafford HVDC Transformers facility, part of the company’s drive to support global decarbonisation through advanced transformer technology.
ACS commenced with the Test Supply Bui

10/07/2025
Vistry Group has agreed two major deals with housing provider Abri to enable the delivery of almost 200 affordable homes across Hampshire, marking a significant step forward in addressing local housing needs.
In Funtley, near Fareham, Vistry has completed a simultaneous land acquisition and forward

10/07/2025
Caddick Construction has officially completed its first Midlands project with the handover of Mansion House, a six-storey residential development comprising 58 new apartments, to joint venture partners Urban Splash and Places for People.
Located on the 43-acre Port Loop island alongside Birmingham