Keltbray has secured a number of energy infrastructure contracts, totalling around £140 million.
The contracts secured include:
• UK Power Networks multi-year distribution framework contract for the refurbishment and replacement of the distribution infrastructure from low voltage to 33kV networks in the Eastern region.
• Northern Ireland Electricity Networks multi-year framework for the maintenance refurbishment and replacement of the distribution overhead line network from low voltage to 33kV.
• Scottish Power Energy Networks multi-year framework for low voltage services modernisation, including the replacement of looped services that will enable the network to be able to respond to the additional requirements that will be driven by the sustainability and carbon reduction agenda.
• SSEN Distribution multi-year framework for the maintenance, refurbishment and replacement of the distribution overhead line network from low voltage to 33kV in the north of Scotland.
• Harmony Energy for the design and construction of two Battery Energy Storage Sites to be built in Yorkshire and Teesside in 2023. The two sites combined will have the capacity to store over 90MW of electricity.
• Lostock Sustainable Energy Plant structural steel package for the main boiler house, as part of a new-build Energy from Waste facility near Northwich in Cheshire that will, when fully operational, export 70MW of electricity to the grid using residual waste, meeting the energy needs of 148,000 homes.
Mike Snee, Managing Director of Keltbray's Energy business, said: "Keltbray's highly collaborative approach to design and delivery is instrumental in upgrading some of the UK's most critical distribution networks. Our technical expertise and experience in delivering safe and efficient programmes of work and alternative energy solutions marks a further step in our strategy to offer a higher value, end-to-end service."
UK
Ireland
Scotland
London











