Mace has completed the second phase of the design and refurbishment of Norfolk's award-winning County Hall, on behalf of client Norfolk County Council who are committed to supporting a diverse and inclusive workforce.
Mace's Interiors team modernised 98,000 sq ft of workspace at Norfolk County Hall over 18 months. Phase 2 of the programme of works included the refurbishment of the north wing, the main tower basement and lower ground floor, improving underutilised areas with generous, open-plan spaces to accommodate 995 staff.
The scheme was designed by Purcell architects and has achieved the Leonard Cheshire Award for 'Most inclusive building/organisation' in the Blue Badge Access Awards in 2022 and was also shortlisted for 'The British Council for Offices' awards and ‘The Royal Institution of Chartered Surveyors (RICS) Awards 2022’.
Recognising a breadth of needs, Mace created flexible spaces with accessible design features, placing ramped entry routes and automated solid timber doors throughout the building, as well as sit-stand desks, integrated meeting rooms and fully inclusive washrooms and shower areas.
The Council Chamber Members' seating area now offers increased wheelchair and motorised chair spaces, with improved general access to all seats through a hinged cinema-style seat cushion, and demountable chairs. A raised central platform for the Council Chairperson now accommodates wheelchair users through adaption to rise and fall.
The new design of the Norfolk County Hall allows members of the public to observe council proceedings within the chamber area via two accessible raised platforms. Integrated digital solutions mean that all council related business can be conducted using digital devices with support functions, such as enhanced audio.
Stewart Ward, MD for Mace Interiors, said: "We are delighted to have delivered a major part of Norfolk County Hall’s refurbishment, breathing new life into the building to transform it into a contemporary, sustainable and inclusive workplace for all. Both design and physical upgrades have meant that the underutilised County Hall has achieved carbon savings and is now able to welcome more people and departments."
Construction News
18/07/2022
Mace Completes Second Phase Of Refurb Work At County Hall


04/07/2025
JV North has announced the list of contractors and consultants appointed to its £500 million social housebuilding framework, which aims to deliver around 3,000 homes across the North West over the next four years.
The housing consortium, which includes 14 members, launched the procurement process i

04/07/2025
Work has officially started on preparing Eston Precinct for demolition, marking the first step in a major regeneration project led by Redcar & Cleveland Borough Council.
Esh Construction has been appointed to deliver the scheme, which will begin with the safe removal of asbestos and the soft strip

04/07/2025
The Secretary of State for Energy Security and Net Zero hasgranted development consent for the Mona Offshore Wind Farm.
The scheme, located in the Irish Sea, will deliver approximately 1,500MW of clean energy capacity and forms part of the Round 4 Offshore Wind Licensing Arrangements. The applicati

04/07/2025
The restoration of Chatham’s iconic Brook Theatre is officially underway, with the appointment of contractors to carry out the £21 million transformation of the 125-year-old building.
Originally opened in 1899 as Chatham Town Hall, the Grade II listed Renaissance-style landmark has served the commu

04/07/2025
Work to upgrade a flood-prone section of Stockbridge Road in Timsbury is set to begin later this month, as part of a joint project between the Environment Agency and Hampshire County Council to improve local flood defences.
Starting on 28 July, the five-week scheme will deliver vital improvements a

04/07/2025
Oldham's town centre regeneration has taken a major step forward, with planning consent now granted for all six sites earmarked for transformation through the partnership between Muse and Oldham Council.
The approval represents a significant milestone in the long-term vision to create a vibrant, in

04/07/2025
As temperatures soared during this week's heatwave, euroloo's innovative EcoWelfare units proved to be a game-changer on construction and outdoor sites across the country.
Designed with comfort and sustainability in mind, these multi-functional welfare units offer everything teams need to stay pro

04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments.
With a reputation for accuracy and reliability, Atlas

03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham.
This marks the first phase of development at the 227-acre site.
The scheme will deliver a range of purpose-built units from 4,820 sq ft

03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough.
Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive