ISG is starting work on a major new education development in Bishop Stortford for Hertfordshire County Council.
The £32 million Avanti Grange Secondary School will provide 1,200 pupil places and serve the new Stortford Fields and St Michael's Hurst communities, across a large 11.4-hectare site that straddles either side of the A120.
The scheme, procured via the Pagabo capital works framework, sees ISG construct a contemporary-designed, two-storey concrete frame structure with brick façade. The southern zone of the split-site development features the main school campus, which has a linear form and incorporates a central full-height glazed spine to link classroom, break out, and communal spaces.
The school boasts a large sports hall and a floodlit multi use games area (MUGA), alongside car parking and drop off areas. A large attenuation swale, or pond structure, will be formed to provide a natural drainage solution and to enhance biodiversity at the site. A roof-mounted photo voltaic array will provide the school with emission free energy, alongside a range of other measures, including high-specification building materials and triple glazed windows to reduce the building's environmental impact.
To access the northern campus zone, ISG will construct a new 30m span steel pedestrian link bridge across the A120. The northern site will accommodate five grass sports pitches across three large terraced areas. A carefully planned cut and fill exercise to level the undulating terrain sees all material retained on site and used to form the terraces for the new pitches.
UK
Ireland
Scotland
London











