Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,349 companies....

Construction News

01/04/2022

Bowmer + Kirkland Completes West London School Project

Construction News Image
Contractor Bowmer + Kirkland has successfully completed a £14 million refurbishment and expansion project of Nanaksar Primary School in Hillingdon, West London.

Nanaksar Primary School is part of the Guru Nanak Multi-Academy Trust, which has an exceptional track record of establishing successful schools. Its founder – Sant Baba Singh Ji – believes that education is a human right for children and has established 19 schools worldwide.

Designed by architecture firm CPMG Architects, and delivered by contractor Bowmer + Kirkland, the £14m project includes new, purpose-built facilities to accommodate up to 840 pupils across all primary years. The new school space – built for the Department for Education - provides a warm, friendly and inclusive environment, accompanied by excellent outdoor sporting, social and learning spaces.

This includes a dedicated outdoor horticultural area to reflect a key part of the Nanaksar ethos and curriculum, providing an invaluable space for learning about plants and plant care, along with the production of fruit and vegetables as healthy food choices. A generously sized greenhouse is also included along with a series of raised beds for cultivation.

Hugh Avison, director at CPMG Architects, said: "It was rewarding to have been able to enhance the external areas to really maximise opportunities for outdoor learning. We made the most of the awkward tapering geometry of the site by creating an orchard, which provides a valuable natural asset to the school campus. In addition, as it matures it will become an important extension to the existing woodland within the Minet Country Park, expanding ecological corridors and benefitting local biodiversity. The planted sedum roof to the main hall spaces provides a further haven for wildlife.
-- Advertisement --
hss



"Another important consideration for the school was the provision of a really supportive environment for the pupils. The building design and layout provides clear sight lines, views across the landscape, small group breakout spaces, as well as distributed staff spaces for pastoral support.

"Overall, we're genuinely pleased to have played an important part in providing best start to schooling life that all pupils deserve, and to have helped increase the number of high-quality education places for the local community."

To support with age progression, younger students are prioritised on the ground floor, with direct access from the reception classrooms to outdoor terrace areas, which minimises their need to use stairs. From this, the building organisation establishes physical progression up the building as pupils move up through year groups.

The arrangement within the teaching wing of the school has been developed to group together four classrooms associated with each year group, accompanied by a dedicated breakout space. Teaching corridors are also split into year group zones, identified by different interior colours and finishes.

Externally, the designs make use of traditional brickwork in an understated and contemporary manner to create a light and welcoming visual appearance, balancing a fresh and independent identity for the school. These two styles of brickwork add warmth and texture, while minimising maintenance requirements to create a building that stands the test of time. Within this, the primary school setting is reflected in more playful elements such as a patterned wall at the main entrance, colourful surfaces and inventive playline markings.

Aftab Ahmed, head of business operations and chief operating officer at Nanaksar Primary School, said: "We are so pleased with the new school facilities provided by the team. This work has marked a major investment for the community in Hillingdon for current and future generations.

"The new school facilities create a safe, welcoming and friendly environment that meets the needs of our current and future pupils across all communities. The facilities not only deliver a great teaching space but allows the teachers deliver the high quality of education using various resources incorporated within the build.

"The work delivered will make sure that everyone thrives in this environment, and that our students get the very best start to their education possible."

The project team consists of landscape architects Ares, planning consultant DPP, structural engineer and highways consultant Curtins, building services engineer CPW, technical advisors MACE and main contractor Bowmer + Kirkland.



Latest Construction News

13/06/2025
A vital piece of Peak District railway infrastructure is set to receive a major upgrade this summer, as Network Rail announces a £7.5 million investment into one of Chapel Milton's iconic twin Victorian viaducts. The 160-year-old, 15-arch structure plays a critical role in the UK's freight network,
13/06/2025
Morgan Sindall Construction has revealed plans to expand its operations in South Yorkshire, building on its strong delivery record in West Yorkshire and aligning with the goals of the newly launched Great North initiative. Backed by northern regional mayors, the Great North initiative aims to unloc
13/06/2025
Construction has officially commenced on the new Children's Cancer Centre (CCC) at Great Ormond Street Hospital for Children (GOSH). Led by long-term design partner BDP, the new centre is one of the most ambitious projects in GOSH's history. The firm is overseeing architecture, landscape, engineeri
13/06/2025
The developer behind the Redworthy Orchard scheme in Yatton has handed over the first homes to a local housing association as part of a wider plan to provide affordable housing in the area. Persimmon Homes Severn Valley has transferred four new properties to Alliance Homes, a move set to ease press
13/06/2025
Wynne Construction has been awarded two major design and build contracts worth over £20 million by Adra to deliver nearly 100 new social homes across North Wales. Construction is already underway at the first site on Berse Road, Wrexham, where Wynne began work in March on a £9 million, 47-home soci
13/06/2025
Great Places Housing Group has officially broken ground on its landmark £37 million LGBTQ+ majority Extra Care housing scheme in Whalley Range, marking the start of construction during Pride Month. The scheme, hailed as the UK's first purpose-built Extra Care development of its kind, is being deliv
13/06/2025
Henry Boot PLC has announced that its property investment and development arm, HBD, has completed the sale of TWO45, a multi-let industrial-led business park in Skelmersdale, to a European real estate developer for £9.5 million. Located on a 10-acre site just minutes from the M58 and M6 motorways,
13/06/2025
Clowes Developments has announced the successful letting of Unit 5A, a newly completed 27,000 sq ft industrial unit at Stud Brook Business Park, to Shawpak Ltd, a pioneering manufacturer of medical device packaging machinery. Founded in Derby in 2013, Shawpak Ltd designs and produces a unique range
13/06/2025
The Hill Group and Legal & General (L&G) have announced a new partnership to deliver 200 affordable homes as part of the first phase of the £450 million City Centre South regeneration scheme in Coventry. This marks the first time the two organisations have collaborated on a major residential devel
13/06/2025
The historic South Crofty tin mining project in Pool, Cornwall, is set to receive a significant boost after being awarded £4,190,500 through the Cornwall and Isles of Scilly Good Growth Programme, marking the largest single private sector investment by the programme to date. Delivered by Cornwall C
Stuart CanvasAqua Direct LtdLakeside HireEfco UK LtdBHB Safety SpecialistsThree One SolarAllways Forktruck Services LtdSensors for Safety LtdNo HydroForge Lifts Ltd