Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

01/12/2020

Tolent Completes Work To Transform Hospital Wards

Contractor Tolent has completed almost £5 million worth of work to transform wards across two Newcastle hospitals in five months.

The works completed across two wards at the RVI and one ward at the Freeman hospital have aided the Newcastle Hospitals NHS Foundation Trust to respond to the second wave of COVID-19.

At the RVI, Ward 49 underwent a full design, reconfiguration and refurbishment from its existing model to create a new intensive care ward to care for COVID-positive patients.

Now a 17-bed facility complete with standard air locks for patient isolation, the design of Ward 49 from P+HS Architects meets the needs of patients and staff operating in critical circumstances including the ability to ensure non-COVID emergency and elective work is able to continue.

The ward also benefits from the highest levels of technology available as well as much needed rest and quiet areas, creating a more comfortable working environment.

-- Advertisement --
hss

Works to Ward 48 in the RVI included a mechanical refurbishment to its ventilation system that enables all 29 beds to be used for COVID-positive patients.

At the Freeman Hospital, works to upgrade Ward 12 included a full refurbishment which is now an exemplar of a new Trust branding to be rolled out on future ward refurbishment programmes.

Working with Medical Architecture, the design of the new 27-bed ward focussed on simplifying design and improving the patient experience and compliance with dementia standards. Using carefully placed local landmarks as signposts to the entrance of patient spaces and the smart use of colours used, this helped give each area of the ward its own identity, helping patients navigate their way around the new facility.

Improvements were also made to elevate the quality of spaces for staff, including the nurses’ stations and better planning of each rooms’ fitted furniture to make the clinical teams’ jobs easier and accessible to all.

The ward was able to be used to help relieve bed pressures for non-COVID patients during the second wave of the pandemic.

David Thompson, regional director for Tolent, said: "I'm incredibly grateful to our teams who have worked around the clock to deliver such critical works for our brilliant NHS.

"Working in a live hospital environment during a global pandemic and still delivering an exceptional quality of work that is going to make real differences to the care of patients and the wellbeing of the staff who care for them is something we’re proud to have been involved in."

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Lakeside HireBRICOFLOR UKPro Structures LtdAdvanced Hydraulics LtdChannel Engineering LTDPolymer Compounders LimitedOrigin Tree SurgeryGoodwin GroupFronius LondonElectrac NI