Urgent repair work is to start at Clun Bridge in Shropshire.
The bridge will be closed from Monday 07 December to Friday 11 December 2020 to enable the repairs to be undertaken to the damaged upstream and downstream bridge parapets. Work will also include repairs to the kerb build-out at the bridge.
Due to the nature of the repair works a full road closure and signed diversion route will be in place for the duration of the works.
When the bridge is closed a signed diversion will be in place diverting traffic via the B4368, B4385, A4113 and A488.
Access over the bridge for pedestrians and dismounted cyclists will remain available throughout the works.
The construction work will be undertaken by the council's term maintenance contractor Kier, and supervised by the council’s term consultant WSP.
UK
Ireland
Scotland
London











