Ridge has completed a major construction project at a West Sussex Academy after it was destroyed by fire.
Ridge offices across London, Oxford, Reading and Birmingham provided architecture, project management, structural, civil and building services engineering, cost management and CDM Principle Designer.
The project was commissioned by The Kemnal Academies Trust (TKAT) on behalf of The Academy, Selsey.
The 750-pupil Academy lost all but two blocks in a major fire in in 2016. As a consequence, students have been taught in temporary classrooms for the last two and a half years. The two blocks which could be salvaged were refurbished while the rest were demolished and re-built.
The new 59,000 sq. ft. Academy includes science laboratories, food technology facilities and an art room, as well as general teaching space, assembly halls and admin areas. It also has a large south-facing façade which is glazed to provide as much natural light as possible, whilst ensuring the areas remain pleasant to teach and learn in. Horizontal brise soleil were also introduced to protect the interior from solar gain and glare, as well as to unify the teaching and assembly blocks.
Lara Dennison, Partner at Ridge, said: "We'd like to extend our congratulations to everyone involved in the re-build of The Academy, Selsey, which has been a huge feat of determination to get pupils back into a permanent learning environment. Ridge was delighted to support the team at TKAT to re-design and project manage the construction of the school which we hope children and teachers alike will love for many years to come."
Tom Garfield, Headteacher at The Academy, Selsey, added: "The new school has been thoughtfully designed by Ridge to provide a more formal learning environment for its pupils, ensuring they are as well prepared for further education and the workplace as possible. We are so pleased to be back in the building and can't thank Lara and her team enough for their support during such a challenging time."
(MH)
Construction News
17/06/2019
Ridge Completes Rebuild Of West Sussex Academy


16/06/2025
Construction is underway on Siemens Mobility's new £20 million Bogie Assembly and Service Centre in Goole, with Yorkshire-based contractor Caddick Construction leading the build.
The 13,500 sq m facility will form a key part of Siemens Mobility's expanding Goole Rail Village and is set to boost the

16/06/2025
Construction has officially been completed on Molson Coors Brewing Company's new UK headquarters in Burton-on-Trent, delivering a state-of-the-art 10,300m² facility to support the brewer’s expanding operations across the UK and Ireland.
The project, led by main contractor Clegg Food Projects, invol

16/06/2025
Equans has signed a new five-year Strategic Partnership agreement with Cheshire West and Chester Council to deliver facilities management services across the Council’s estate.
The deal follows the conclusion of a previous joint venture between the two parties, known as QWEST, which had been operati

16/06/2025
Winvic Construction Ltd has been appointed by Guildford Borough Council to deliver a major package of highways infrastructure works for the Weyside Urban Village, a landmark regeneration project that will bring 1,550 new and affordable homes to the area alongside green spaces, employment zones, a co

16/06/2025
Real estate developer TT Group has received planning approval from Stoke-on-Trent City Council to convert the former Telecom House office building in Hanley into 99 residential units.
The seven-storey, 103,000 sq ft property on Trinity Street was previously occupied by BT and has remained vacant. T

16/06/2025
Foundation engineering specialist Roger Bullivant Limited (RBL) is making significant progress on the Balderton Rise residential development in Newark, working in partnership with housing provider Lovell.
The current phase of the project includes 102 new homes and highlights RBL’s commitment to su

16/06/2025
NHS Shared Business Services (NHS SBS) has launched the third iteration of its Modular Buildings framework agreement, designed to accelerate the delivery of vital infrastructure projects across the UK in healthcare, education, housing, and other public services.
The new Modular Buildings 3 framewor

16/06/2025
Network Rail has successfully completed a major £84 million upgrade to overhead line equipment (OLE) on the Midland Main Line between London St Pancras and Bedford — delivering the project on time and under budget.
The OLE125 Compatibility project, which ran from September 2023 to June 2025, replac

16/06/2025
Kier has completed the delivery of a major new life sciences facility at the Advanced Research Clusters (ARC) West London Refinery Building in Hammersmith, providing 150,000 sq ft of high-specification laboratory, research and development space.
Situated on the northern embankment of the River Tham

16/06/2025
Esh Group has been recognised as one of the UK's Best Managed Companies 2025, earning a place among just ten private businesses selected nationally for the prestigious accolade.
The award, presented through Deloitte Private's Best Managed Companies programme, honours outstanding organisational perf