Off-Grid PowerPack is an off-grid power system that is easy to transport and quick to deploy. Designed for operating low power AC or DC equipment, everything you need to provide a remote power source is neatly fitted into a single, pallet-sized box. In less than an hour, it is now possible to set up a complete solar-wind hybrid power supply.
Rugged Enclosure
The Off-Grid PowerPack is pallet-sized, so it can be delivered on a single pallet, or even in the back of a pickup, reducing transport costs and making it possible to deploy in remote areas. Made from galvanised steel, Off-Grid PowerPack is designed to be long-lasting and durable in some of the world's harshest conditions.
Integrated Solar
The unique fold-away design of the Off-Grid PowerPack solar panels means that they are protected during transport and can be setup in seconds, as well as being set at the correct angle for the sun. Using two 160W ultra-high-efficiency solar panels made from Sunpower cells, Off-Grid PowerPack can generate over 1.5kWh a day in summer from solar alone.
Wind-Solar Hybrid
Unlike other "complete" power solutions, Off-Grid PowerPack comes with its own turbine. Unlike the sun, wind is a 24-hour a day power source, so a hybrid wind-solar power system is significantly more productive than just solar or wind alone. In general, when there is more sun, there is less wind and vice versa. Having both wind and solar, Off-Grid PowerPack is a year-round power source.
Stored Power
Producing power is only one half of the equation and storing that power is the other. As well as storing power to be used, the battery bank is also the "reserve". In many parts of the world, there will be days where there is neither much sun or wind. On these days, we must rely on the reserve power to keep equipment running. Off-Grid PowerPack is fitted with a bank of industrial grade deep-cycle AGM (Absorbent Glass Matting) batteries that are designed to give many years' service, even when they are heavily used. AGM batteries do not contain any free-liquid electrolyte and can even be used upside down, meaning that they are much more suited to the rigours of transport. As standard, Off-Grid PowerPack is fitted with six 120Ah batteries, storing a total of 8.64kWh of energy.
Remote Control & Monitoring
The Off-Grid PowerPack is fitted with the innovative Victron Venus GX which displays power production, power output and battery status, as well as allowing you full control over the system. When connected to the internet via the built-in Ethernet port, or via the optional WiFi receiver or 3G/4G dongle, live data is transmitted to Victron's proprietary VRM Portal. Logging in to the VRM Portal from your laptop or the mobile app, means that you can see exactly how your Off-Grid PowerPack is performing (live and historical), receive alarm signals by email and even change system settings remotely.
Construction News
26/03/2019
ML2 Networx Launches New Solar & Wind Powered CCTV


04/07/2025
JV North has announced the list of contractors and consultants appointed to its £500 million social housebuilding framework, which aims to deliver around 3,000 homes across the North West over the next four years.
The housing consortium, which includes 14 members, launched the procurement process i

04/07/2025
Work has officially started on preparing Eston Precinct for demolition, marking the first step in a major regeneration project led by Redcar & Cleveland Borough Council.
Esh Construction has been appointed to deliver the scheme, which will begin with the safe removal of asbestos and the soft strip

04/07/2025
The Secretary of State for Energy Security and Net Zero hasgranted development consent for the Mona Offshore Wind Farm.
The scheme, located in the Irish Sea, will deliver approximately 1,500MW of clean energy capacity and forms part of the Round 4 Offshore Wind Licensing Arrangements. The applicati

04/07/2025
The restoration of Chatham’s iconic Brook Theatre is officially underway, with the appointment of contractors to carry out the £21 million transformation of the 125-year-old building.
Originally opened in 1899 as Chatham Town Hall, the Grade II listed Renaissance-style landmark has served the commu

04/07/2025
Work to upgrade a flood-prone section of Stockbridge Road in Timsbury is set to begin later this month, as part of a joint project between the Environment Agency and Hampshire County Council to improve local flood defences.
Starting on 28 July, the five-week scheme will deliver vital improvements a

04/07/2025
Oldham's town centre regeneration has taken a major step forward, with planning consent now granted for all six sites earmarked for transformation through the partnership between Muse and Oldham Council.
The approval represents a significant milestone in the long-term vision to create a vibrant, in

04/07/2025
As temperatures soared during this week's heatwave, euroloo's innovative EcoWelfare units proved to be a game-changer on construction and outdoor sites across the country.
Designed with comfort and sustainability in mind, these multi-functional welfare units offer everything teams need to stay pro

04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments.
With a reputation for accuracy and reliability, Atlas

03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham.
This marks the first phase of development at the 227-acre site.
The scheme will deliver a range of purpose-built units from 4,820 sq ft

03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough.
Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive