Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
11/02/2019

C16th East Suffolk Farmhouse - Anglia Lime Company

Construction News Image
This substantial Grade II Listed former farmhouse dates from the 16thC with subsequent 17th and 19th re-modelling. Its construction is primarily oak timber frame and features a double jettied gable at the first floor with brick noggin exposed in Flemish bond. A ground floor oriel window is flanked by pargeted render panels and the outshot was rendered with partial parge work to the gable still visible.

The Defect

Exposed timbers and brickwork to the gable had been re-pointed in recent years and painted with heavy modern paint, these areas were showing sign of distress and a sorry appearance.

Render to the gable, return wall and outshot had been patch repaired over the 20thCentury with heavy impervious cement render and various forms of filler, along with modern paint which was leading to the degradation of the structure.

During exposure extensive decay to supporting laths and de-lamination of render coats, some resultant from water penetration and previous repairs resulted in render being removed.

hss

Works

Careful measure and recording of the remaining detail and dimensions of parge work was undertaken so that templates and tools could be manufactured by a local engineer to replicate previous design and layout.

The heavy paint to the exposed timber gable was removed with a chemical stripper (manufactured & supplied by Strippers Paint Removers) and cement pointing to brick noggins was carefully removed and re-pointing undertaken with one of ALC's readymixed lime mortar mixes along with localised brick repairs with reclaimed Tudor reds.

External cement render was removed and period render was found to be in a friable condition with supporting laths rot affected and fixing nails corroded.

The previous rendered walls were then re-lathed and applied with ALC's Fibrechalk and laid to a smooth finish. The gable end wall to outshot was re-dressed with parge work consisting of a continuous rope in borders, whilst panels to either side of the ground floor oriel window of the main gable was stamped with a pricked indent with beaded surround to match existing profile.

To finish, and preserve it was all then painted with ALC's Original Limewash.

The restoration was completed by Rickards Period Plastering Ltd.

Latest Construction News

24/04/2019

English housing association The Guinness Partnership has secured a landmark acquisition in Leeds. The company has acquired a 928-home site near Leeds Docks, the largest in its history. The site is just a few minutes' walk from Leeds Station and the new HS2, with Leeds South Bank set to provide 35
24/04/2019

Interserve has won a £8 million construction contract with Leicestershire Partnership NHS Trust (LPT). The firm will deliver a new 15-bed mental health inpatient unit for children and young people on the Glenfield Hospital site. Subject to the finalisation of the contract, Interserve Construction
24/04/2019

The British Standards Institution (BSI) has awarded Amey certification for ISO 45001:2018, a new International Health and Safety standard. This provides a framework to assist companies to improve employee safety, reduce workplace risks and create safer working conditions that support wellbeing. T
24/04/2019

The growth of cloud computing resources will see remote surveillance cameras, previously only available to the largest construction companies, making strong inroads into the construction sector mainstream in 2019. This is the view of IT solutions firm, Agmis, who have focused on the construction se
24/04/2019

A 2.75% pay rise for construction workers has been agreed for the year ahead following successful pay negotiations between the Federation of Master Builders (FMB) and Unite the union. The Building and Allied Trades Joint Industrial Council (BATJIC) has agreed a one-year deal involving a 2.75% pay r
24/04/2019

Sieger Systems have announced the launch of the world's tallest thermally broken, aluminium bi-folding door, available exclusively to IQ Glass in the UK. The Sieger Super Lux Bi-folding Door is a fully tested bi-folding door system, able to achieve opening bi-fold doors from 3m to 5m tall. The unpr
24/04/2019

Machinery removal, machinery relocation and machinery installation requires thorough planning and forethought. The moving and relocation of your machinery and plant has to be planned, often in great detail for safety, efficiency and hassle free completion. The last thing you need is damage, disrupti
24/04/2019

CXS Tools is proud to present another product range available for purchase. Some new varieties of sanding discs have been developed within the Mirka range, one of the leading brands in the construction industry when it comes to professional sanding finishes on construction projects. Today, we are
23/04/2019

Rhyl's Queen's Buildings are set to become a pivotal piece in the ongoing regeneration of the town. Denbighshire County Council is working with private sector development partners to consider how to transform the site into a vibrant mix of retail, food and beverage, contemporary market, office and
23/04/2019

Niftylift has said it is "proud" to announce that it has been named as a winner of both the Queen's Award for Enterprise – Innovation and the Queen's Award for Enterprise - International Trade - two of the UK's highest accolades for business success. Queen's Award for Enterprise – Innovation
R P L ConstructionEnvironmental Street FurnitureRobust (UK) LtdElegant VenetianAuswood Joinerylicata+greutolWaterscape Solutions LtdVentx LimitedUK ScaffoldingGrafo Therm
Terms and Conditions