Aspex has been appointed to supply its range of doorsets to a student accommodation development in Coventry.
The firm will use a custom-built version of its Novista Riser Steel Doorsets on the 900-bed Paradise Street scheme.
It features a bottom and over panel to create a full height door with a slim flush frame allowing more space for the M&E equipment for the project.
Over 700 Novista Riser Doorsets are being supplied and a project specific fire test was carried out at BM Trada. This included a 50mm high Nullifire Batt board above the overpanel for the M&E services to pass through.
Aspex is also supplying the internal timber doorsets and the access control system which includes an electronic lock on all of the bedrooms, allowing students to access the building and their rooms with a card or their smartphone for enhanced safety.
FMB Architects is working alongside Aspex on the project.
Ashley Burberry, Managing Director at Aspex, said: "The student accommodation sector has been hugely successful for us. We're delighted to have the opportunity to create a bespoke version of our doorsets which emphasises the versatility of our Novista Riser system. The access control system ensures students remain safe, allowing us to take safety to new heights."
David Taylor, Senior Architect at FBM Architects, added: "For this particular project, we required a frameless doorset that we could paint on site to match the walls. The Novista system met our requirements and we are really pleased with how the doors look and blend into the surroundings."
(CM/JG)
Construction News
06/02/2019
Aspex Lands Contract For Coventry Student Accommodation


16/06/2025
Construction is underway on Siemens Mobility's new £20 million Bogie Assembly and Service Centre in Goole, with Yorkshire-based contractor Caddick Construction leading the build.
The 13,500 sq m facility will form a key part of Siemens Mobility's expanding Goole Rail Village and is set to boost the

16/06/2025
Construction has officially been completed on Molson Coors Brewing Company's new UK headquarters in Burton-on-Trent, delivering a state-of-the-art 10,300m² facility to support the brewer’s expanding operations across the UK and Ireland.
The project, led by main contractor Clegg Food Projects, invol

16/06/2025
Equans has signed a new five-year Strategic Partnership agreement with Cheshire West and Chester Council to deliver facilities management services across the Council’s estate.
The deal follows the conclusion of a previous joint venture between the two parties, known as QWEST, which had been operati

16/06/2025
Winvic Construction Ltd has been appointed by Guildford Borough Council to deliver a major package of highways infrastructure works for the Weyside Urban Village, a landmark regeneration project that will bring 1,550 new and affordable homes to the area alongside green spaces, employment zones, a co

16/06/2025
Real estate developer TT Group has received planning approval from Stoke-on-Trent City Council to convert the former Telecom House office building in Hanley into 99 residential units.
The seven-storey, 103,000 sq ft property on Trinity Street was previously occupied by BT and has remained vacant. T

16/06/2025
Foundation engineering specialist Roger Bullivant Limited (RBL) is making significant progress on the Balderton Rise residential development in Newark, working in partnership with housing provider Lovell.
The current phase of the project includes 102 new homes and highlights RBL’s commitment to su

16/06/2025
NHS Shared Business Services (NHS SBS) has launched the third iteration of its Modular Buildings framework agreement, designed to accelerate the delivery of vital infrastructure projects across the UK in healthcare, education, housing, and other public services.
The new Modular Buildings 3 framewor

16/06/2025
Network Rail has successfully completed a major £84 million upgrade to overhead line equipment (OLE) on the Midland Main Line between London St Pancras and Bedford — delivering the project on time and under budget.
The OLE125 Compatibility project, which ran from September 2023 to June 2025, replac

16/06/2025
Kier has completed the delivery of a major new life sciences facility at the Advanced Research Clusters (ARC) West London Refinery Building in Hammersmith, providing 150,000 sq ft of high-specification laboratory, research and development space.
Situated on the northern embankment of the River Tham

16/06/2025
Esh Group has been recognised as one of the UK's Best Managed Companies 2025, earning a place among just ten private businesses selected nationally for the prestigious accolade.
The award, presented through Deloitte Private's Best Managed Companies programme, honours outstanding organisational perf