ISG has completed refurbishment work at Moss Side Leisure Centre in Manchester.
The facility, which has officially opened, includes a state-of-the-art 120-station gym, brand-new studio, programmable gym, and two swimming pools, including a teaching pool and 6-lane, 25-metre main pool.
It also features two sports halls, three squash courts, a sauna and steam room, 'Changing Places' facility with accessible pool platform lift, and a pool viewing area.
The revamped centre is the result of a year-long, £8 million refurbishment and extension project by ISG for Manchester City Council, awarded through the North West Construction Hub (NWCH) Framework.
Re-roofing works, replacement of the façade with thermally efficient cladding panels, LED lighting, new mechanical and electrical systems, and the installation of a Combined Heat and Power (CHP) plant has seen the building's energy efficiency improved by 40%.
UK
Ireland
Scotland
London











