A number of additional environmental checks are to take place around Grenfell Tower in an effort to reassure survivors and local residents.
The Ministry of Housing, Communities and Local Government, Royal Borough of Kensington and Chelsea, NHS England, Public Health England and the Environment Agency have joined forces to launch the inspections.
NHS England has also committed up to £50 million to carry out a five-year health monitoring programme, as well as ongoing air quality monitoring at the site, the plans involve:
• further environmental sampling of the site, including comprehensive soil analysis to check for any signs of contamination
• water analysis will take place if required
• wider health monitoring and treatment options to reassure those affected
Secretary of State for Communities, the Rt Hon James Brokenshire MP said: "We take the wellbeing of Grenfell Tower survivors and local residents extremely seriously and it's essential they have peace of mind regarding their health.
"The government is asking leading experts from the Environment Agency to make sure soil surveying around the tower is comprehensive and that analysis will be provided to the public.
"We recognise the concerns the community have raised with us, and we are clear that we will do whatever it takes to give them the reassurance they need and deserve."
The immediate risk to health in the aftermath of the fire was from potentially contaminated air and independent air quality monitoring was commissioned by Public Health England, which has shown the risk to public health to be consistently low.
Soil testing will determine whether there are contaminants identified beyond those. Many parts of the land that will be investigated are known to be former industrial sites where contamination can already exist, but the examinations that will be carried out will determine if remediation is required.
(CM/MH)
UK
Ireland
Scotland
London











