More than £570 million is to be made available for less established renewable electricity projects in the next round of Contracts for Difference (CfD) auctions, the UK Government has announced.
Energy Minister Richard Harrington confirmed today, 11 October, that up to £577m of funding will be available for developers to compete for during the next CfD auction, which is planned for spring 2019.
The move is part of the government's Clean Growth Strategy, which will be published later this week and includes ambitious proposals on housing, business, transport and the environment, as well as the power sector. It will also show how actions taken to tackle emissions have helped to reduce energy bills for households.
According to National Grid, low carbon generation provided more than half (52%) of the UK's electricity over the summer, while PwC analysis shows the UK decarbonising faster than any other G20 nation.
Minister Harrington said: "The government's Clean Growth Strategy will set out how the whole of the UK can benefit from the global move to a low carbon economy.
"We've shown beyond doubt that renewable energy projects are an effective way to cut our emissions, while creating thousands of good jobs and attracting billions of pounds worth of investment."
(LM/MH)
Construction News
11/10/2017
More Than £570m Available For New Renewable Energy Schemes - Govt


06/05/2025
Scarborough Group International (SGI) has announced its vision for the next phase of development at Thorpe Park Leeds, outlining plans to introduce a major industrial and logistics hub, new urban apartments, and additional Grade A business spaces with supporting amenities.
Building on more than 25

06/05/2025
Kirklees Council has submitted updated plans for the refurbishment of the historic George Hotel in Huddersfield, proposing an increase in guest rooms while carefully preserving the landmark building's architectural and heritage features.
Working in partnership with architects and Historic England,

06/05/2025
Persimmon Homes has officially broken ground on its new Hawthorn Park development in Leominster, welcoming local councillors to the site to mark the start of construction.
The Deputy Leader of Herefordshire Council, Councillor Elissa Swinglehurst, and Councillor Allan Williams, who represents Leomi

06/05/2025
Engineering and infrastructure group Murphy has announced a strategic partnership with Australia-based Abergeldie Complex Infrastructure.
The deal will see Murphy take a 40% stake in Abergeldie, a move that strengthens both companies' capabilities and reflects a shared commitment to values-led infr

06/05/2025
Network Rail has completed a programme of emergency repairs to an embankment on the Brighton Main Line near Three Bridges, restoring full safety and stability to a key stretch of one of the country's busiest rail routes.
The repairs were carried out after a landslip occurred between Three Bridges a

06/05/2025
As the UK's new Online Safety Act brings strict protections for young people online, training provider Essential Site Skills latest blog highlights the wider impact these measures will have on safeguarding the workforce of tomorrow.
Click

06/05/2025
We decided to group these subjects into one page as they're all closely related. This information was updated in July 2019 and is accurate at time of writing.
Grade 1 Lowest
Intruders are expected to have little knowledge of the alarm system and may be restricted to a limited range of tool

06/05/2025
Looking for a standing stairlift in the UK? Read on...
Which manufacturers make stand-up stairlifts, who needs them, their benefits, and how much do they cost? Let's discover compact stand-on stair lifts for the elderly, people with joint problems or those with staircases too narrow to fit a tradit

06/05/2025
With over 1.4 million kilometres of underground services in the UK, underground cables, pipes, and services are hit and damaged every day, sometimes resulting in serious injury, the cost of repair, and a loss of business reputation.
This is mainly caused by operatives not being able to use cable av

06/05/2025
The max weight limit for a straight stairlift is 31 stone, or 197kg, however there's much more choice at 25 stone weight limit.
For curved stairlifts the max weight limit is 30 stone, or 190kg, however there's much more choice at 19 stone limit.
Overweight people with mobility issues can face esp