A demolition firm has been fined after a worker fell from a scaffolding platform and suffered severe injuries.
DSR Demolition Limited pleaded guilty to breaching Regulation 6(3) of the Work at Height Regulations 2005 and Section 33(1)(c) of the Health and Safety at Work Act 1974.
It was fined £5,000.
The incident happened at the Hillington Industrial Estate in Glasgow on the 30 December 2011.
The 50-year-old employee was carrying out work from a mobile scaffolding platform to allow a building to be demolished when a cable tray swung towards him as he was cutting it from the ceiling.
The tray hit the worker in the shin and knocked him off balance, causing him to fall five feet off the platform.
The employee sustained a fractured right elbow and a fractured left arm, which required surgery.
He also suffered bruising to his head and has been unable to return to work.
An investigation by the Health and Safety Executive (HSE) discovered the fall hall because the platform was not assembled correctly, with missing guard rails and toeboards.
In addition, no suitable risk assessment was available on the site for the use of the mobile scaffolding platform and it had not been inspected before use.
HSE Inspector Graham Mitchell said: "The injured person was at risk of falling because the tower was not put together properly. Work at Height Regulations require those in control of work at height to take sufficient measures to prevent injuries and this fall could have been easily prevented."
(LM/CD)
Construction News
02/12/2015
Demolition Company Fined After Worker Falls From Platform


17/06/2025
NASC, the UK's leading trade body for scaffolding and access, is proud to announce the release of its 2025 Safety Report, showcasing continued improvements in health and safety standards across the scaffolding and access industry.
This annual publication presents a comprehensive overview of acciden

16/06/2025
Construction is underway on Siemens Mobility's new £20 million Bogie Assembly and Service Centre in Goole, with Yorkshire-based contractor Caddick Construction leading the build.
The 13,500 sq m facility will form a key part of Siemens Mobility's expanding Goole Rail Village and is set to boost the

16/06/2025
Construction has officially been completed on Molson Coors Brewing Company's new UK headquarters in Burton-on-Trent, delivering a state-of-the-art 10,300m² facility to support the brewer’s expanding operations across the UK and Ireland.
The project, led by main contractor Clegg Food Projects, invol

16/06/2025
Equans has signed a new five-year Strategic Partnership agreement with Cheshire West and Chester Council to deliver facilities management services across the Council’s estate.
The deal follows the conclusion of a previous joint venture between the two parties, known as QWEST, which had been operati

16/06/2025
Winvic Construction Ltd has been appointed by Guildford Borough Council to deliver a major package of highways infrastructure works for the Weyside Urban Village, a landmark regeneration project that will bring 1,550 new and affordable homes to the area alongside green spaces, employment zones, a co

16/06/2025
Real estate developer TT Group has received planning approval from Stoke-on-Trent City Council to convert the former Telecom House office building in Hanley into 99 residential units.
The seven-storey, 103,000 sq ft property on Trinity Street was previously occupied by BT and has remained vacant. T

16/06/2025
Foundation engineering specialist Roger Bullivant Limited (RBL) is making significant progress on the Balderton Rise residential development in Newark, working in partnership with housing provider Lovell.
The current phase of the project includes 102 new homes and highlights RBL’s commitment to su

16/06/2025
NHS Shared Business Services (NHS SBS) has launched the third iteration of its Modular Buildings framework agreement, designed to accelerate the delivery of vital infrastructure projects across the UK in healthcare, education, housing, and other public services.
The new Modular Buildings 3 framewor

16/06/2025
Network Rail has successfully completed a major £84 million upgrade to overhead line equipment (OLE) on the Midland Main Line between London St Pancras and Bedford — delivering the project on time and under budget.
The OLE125 Compatibility project, which ran from September 2023 to June 2025, replac

16/06/2025
Kier has completed the delivery of a major new life sciences facility at the Advanced Research Clusters (ARC) West London Refinery Building in Hammersmith, providing 150,000 sq ft of high-specification laboratory, research and development space.
Situated on the northern embankment of the River Tham