Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
24/11/2015

Hydrok Provides 'Off-Site' Solutions For Scottish Water

Construction News Image
In order to minimise 'on-site' health and safety risk, reduce 'on-site' costs, speed up installation time and, in many cases, reduce disruption to the general public, Scottish Water have adopted Hydrok's solution for the 'off-site' manufacture of bespoke stainless steel CSO chambers for several new CSO construction projects within the Glasgow area.

Working in association with George Leslie, Hydrok who utilise stainless steel for all their CSO screen solutions, fabricated a number of bespoke stainless steel chambers with the CSO screens pre-installed in readiness for speedy installation. At Corpus Christi, outside a primary school, a package chamber incorporating a 4.5m2 Static Peak Screen was rapidly installed during the school holidays, minimising disruption to the dual carriage way at the location. Similarly, a chamber containing a 6m2 Peak Screen was installed at the junction of Alderman Road with Hermitage Avenue. A Hydrok Mechanical Mecmex CSO screen and package stainless steel chamber assembly has also been installed at the junction of Love Street and New Sneddon Street in Paisley where a 3m long, 90º Mecmex was fitted. A future scheme is also planned for the installation of a 2m long 180º Mecmex at the junction of Dumbarton Road and Dyke Street in Glasgow by the end of October 2015.

-- Advertisement --
hss

The advantages of the 'off-site' method of manufacturer allow Hydrok to completely pre-fabricate the solution within their factory and include all of the necessary features such as weir walls, benching, access step rungs, safety chains etc; each package is then complete and ready for faster site installation.

Careful consideration of the screen and chamber design can also reduce the size of the final package which will reduce manufacture costs and the amount of site excavation compared to the traditional method of casting concrete, thus creating less site waste for disposal, allowing the employment of smaller cranes and consequently minimising the general disruption to local businesses and the general public. This stainless steel chamber approach also permits larger chambers to be constructed in sections which are then simply bolted together on site negating the need for 'over size' lorry transportation which would incur the inherent higher costs.

Latest Construction News

07/05/2024

Construction work has commenced at Cordia UK's latest project and inaugural build-to-rent (BTR) development, The Lampworks. The Birmingham-based property developer has appointed Shropshire-based construction management practice buildfifty5 to deliver the main construction works for the project in ...
07/05/2024

Wates has held a 'topping out' ceremony with Riverstone to mark the structural completion of a later living residence, Riverstone Bishops Avenue. The ceremony was attended by the Mayor of Barnet, the Barnet Education and Learning Service, Barnet & Southgate College and also BOOST, who work with ...
07/05/2024

Building work has started on a new skills centre that will help City College Norwich train more young people for careers in the construction industry. The ground has been broken at the college's Ipswich Road campus where the £4.4m building is being constructed by MJS Projects. Funding for the new ...
07/05/2024

Network Rail is encouraging residents in New Mills to attend an information drop-in event about urgent railway work on Thursday 9 May. Following recent emergency ground investigations, engineers have confirmed that work is required immediately to repair damage to the earth that supports the ...
07/05/2024

Ascent Homes has announced plans to double its turnover to £80 million and further increase its workforce. Having recently grown from 40 to now 70 employees it now has ambitions to take this to over 100 employees within the next year. To hit its targets, Ascent Homes will add four new sites ...
07/05/2024

Vinyl flooring has become an essential choice for children's rooms, living rooms, and hallways. Whether in your own home or a rental apartment, ...
07/05/2024

Family-run flooring experts Woodpecker Flooring are celebrating the craftsmanship that goes into their hand-finished boards with a specially curated collection. The Artisan Interiors collection showcases the handcrafted flooring created by Woodpecker’s experienced craftspeople. The three-strong ...
07/05/2024

Eclectic interiors brand Where Saints Go has launched a new seating collection inspired by timeless Scandi style. The Scandi Edit brings together five statement seats, typified by sleek lines and wooden finishes. Each seat has been handpicked for its versatility, ensuring they not only complement ...
03/05/2024

Construction firm GRAHAM has started building work on a £19 million Community Diagnostic Centre (CDC) in Workington town centre. The Centre will be located next to Cumberland Council's government-funded Innovation Hub which is also under development in Central Way. GRAHAM is the principal ...
03/05/2024

Significant progress is being made on a new £2 million recycling centre in Haverhill. Construction works are being completed by FCC Environment and its contractor DXI Regeneration Ltd, on behalf of Suffolk County Council. The facility will be operated by FCC Environment, which manages all of ...
Lakeside HireEfco UK LtdJWCThink Construction Skills Ltd.Aqua Direct LtdBRICOFLOR UKBurnside Plant Hire LtdGroundForm Piling LtdLuxcrete LimitedSheridan Skips Ltd
Terms and Conditions
2024/05/07 15:29:29