Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

24/11/2015

Hydrok Provides 'Off-Site' Solutions For Scottish Water

In order to minimise 'on-site' health and safety risk, reduce 'on-site' costs, speed up installation time and, in many cases, reduce disruption to the general public, Scottish Water have adopted Hydrok's solution for the 'off-site' manufacture of bespoke stainless steel CSO chambers for several new CSO construction projects within the Glasgow area.

Working in association with George Leslie, Hydrok who utilise stainless steel for all their CSO screen solutions, fabricated a number of bespoke stainless steel chambers with the CSO screens pre-installed in readiness for speedy installation. At Corpus Christi, outside a primary school, a package chamber incorporating a 4.5m2 Static Peak Screen was rapidly installed during the school holidays, minimising disruption to the dual carriage way at the location. Similarly, a chamber containing a 6m2 Peak Screen was installed at the junction of Alderman Road with Hermitage Avenue. A Hydrok Mechanical Mecmex CSO screen and package stainless steel chamber assembly has also been installed at the junction of Love Street and New Sneddon Street in Paisley where a 3m long, 90º Mecmex was fitted. A future scheme is also planned for the installation of a 2m long 180º Mecmex at the junction of Dumbarton Road and Dyke Street in Glasgow by the end of October 2015.

-- Advertisement --
hss

The advantages of the 'off-site' method of manufacturer allow Hydrok to completely pre-fabricate the solution within their factory and include all of the necessary features such as weir walls, benching, access step rungs, safety chains etc; each package is then complete and ready for faster site installation.

Careful consideration of the screen and chamber design can also reduce the size of the final package which will reduce manufacture costs and the amount of site excavation compared to the traditional method of casting concrete, thus creating less site waste for disposal, allowing the employment of smaller cranes and consequently minimising the general disruption to local businesses and the general public. This stainless steel chamber approach also permits larger chambers to be constructed in sections which are then simply bolted together on site negating the need for 'over size' lorry transportation which would incur the inherent higher costs.

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Lakeside HireBRICOFLOR UKPro Structures LtdBHB Safety Specialists123vSWK Health & Safety ConsultingFireproAllways Forktruck Services LtdMilestone FlooringWest Base Electronics Ltd