North Devon Homes has been fined £6,000 with £833 in costs after capping off a chimney at one of its properties despite the chimney being in use.
Barnstaple Magistrates' Court heard how the South-West housing firm were investigating damp at a property at Church Lake, Landkey.
In an attempt to solve the problem, a chimney was removed and the roof tiled over, leaving the chimney terminating within the home's loft despite the chimney being used to flue the gas fire and gas boiler.
Several weeks after the work was completed, the tenant went into the loft and discovered a very strong unpleasant smell.
At around this time, the tenant's carbon monoxide alarm was activated.
Emergency gas services were called to the home and classed the situation as 'immediately dangerous', meaning the situation could be an immediate risk to life.
The incident was investigated by the Health and Safety Executive (HSE) which prosecuted the housing firm.
North Devon Homes of Westacott Road, Barnstaple, pleaded guilty to a breach of the Health and Safety at Work etc Act 1974.
HSE Inspector, Simon Jones, said: "This was an incredibly dangerous situation where gas appliances were left to pump potentially poisonous and fatal gasses into the loft space of a home instead of to outside the property.
"Whenever a chimney is removed or capped careful checks should be taken to ensure that the chimney is not being used and cannot be used in the future.
"Proper control by North Devon Homes Ltd and clear work instructions would have prevented this dangerous situation from arising and putting the lives of their tenants at risk."
(LM/MH)
Construction News
14/08/2015
HSE Prosecutes Housing Firm For Safety Failings

04/07/2025
JV North has announced the list of contractors and consultants appointed to its £500 million social housebuilding framework, which aims to deliver around 3,000 homes across the North West over the next four years.
The housing consortium, which includes 14 members, launched the procurement process i

04/07/2025
Work has officially started on preparing Eston Precinct for demolition, marking the first step in a major regeneration project led by Redcar & Cleveland Borough Council.
Esh Construction has been appointed to deliver the scheme, which will begin with the safe removal of asbestos and the soft strip

04/07/2025
The Secretary of State for Energy Security and Net Zero hasgranted development consent for the Mona Offshore Wind Farm.
The scheme, located in the Irish Sea, will deliver approximately 1,500MW of clean energy capacity and forms part of the Round 4 Offshore Wind Licensing Arrangements. The applicati

04/07/2025
The restoration of Chatham’s iconic Brook Theatre is officially underway, with the appointment of contractors to carry out the £21 million transformation of the 125-year-old building.
Originally opened in 1899 as Chatham Town Hall, the Grade II listed Renaissance-style landmark has served the commu

04/07/2025
Work to upgrade a flood-prone section of Stockbridge Road in Timsbury is set to begin later this month, as part of a joint project between the Environment Agency and Hampshire County Council to improve local flood defences.
Starting on 28 July, the five-week scheme will deliver vital improvements a

04/07/2025
Oldham's town centre regeneration has taken a major step forward, with planning consent now granted for all six sites earmarked for transformation through the partnership between Muse and Oldham Council.
The approval represents a significant milestone in the long-term vision to create a vibrant, in

04/07/2025
As temperatures soared during this week's heatwave, euroloo's innovative EcoWelfare units proved to be a game-changer on construction and outdoor sites across the country.
Designed with comfort and sustainability in mind, these multi-functional welfare units offer everything teams need to stay pro

04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments.
With a reputation for accuracy and reliability, Atlas

03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham.
This marks the first phase of development at the 227-acre site.
The scheme will deliver a range of purpose-built units from 4,820 sq ft

03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough.
Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive