Improvement work to stabilise a slope and re-open a footpath in Wymouth is now complete.
The project, joint-funded by both Weymouth & Portland Borough Council and Dorset County Council, was a two phased project.
Phase one, which included repairing and anchoring the east wing wall of the Wyke Road Tunnel and stabilisation of the upper slope, was completed in December 2015.
Phase two of the scheme started in January 2015 to stabilise the lower slope and reinstate the footpath from Wyke Road to the Rodwell Trail.
The Rodwell Trail and Wyke Road tunnel remained open during the work, although the width of a small section of the trail was reduced and cordoned off for the site.
Weymouth & Portland Borough Council appointed local consulting engineer Aspley Associates to undertake the design and contractors Westpointe Limited and H C Lewis to carry out the works.
(CD/JP)
UK
Ireland
Scotland
London











