Improvement work on the M50 junction 1 near Twyning Green, Gloucestershire is to begin on 16 January.
The work, to be carried out by the Highways Agency includes repairing an embankment and installing a new safety barrier, drainage, road markings and traffic signs. The hard shoulder will be resurfaced.
To reduce the need for a long-term closure of the junction 1 westbound exit slip road during the work, it will be widened by altering the kerb line. This will be done under a full closure of the westbound entry and exit slip roads and the hard shoulder and lane one of the M50 westbound from 10pm on Friday 16 January to 6am on Monday 19 January.
In addition, on the night of Sunday 18 January, from 8pm to 6am, there will be a full closure of the M50 westbound between M5 junction 8 and M50 junction 1.
The closures of the hard shoulder and lane one of the M50 westbound and the M50 junction one entry slip road will remain in place 24 hours a day until the end of the scheme. A 50mph speed limit will be in place.
During the full closure of the M50 traffic will be diverted from the M5 junction 8 to M5 junction 11 and take the A40 and A417 to join the M50 at junction 2.
When the M50 junction 1 exit slip road is closed, traffic will stay on the M50 to junction 2, turn around and return to junction 1 on the eastbound carriageway. During the closure of the M50 junction 1 westbound, entry slip road traffic will be diverted to the eastbound carriageway and travel to M5 junction 8 where it can turn around and join the westbound carriageway.
(CD/JP)
Construction News
06/01/2015
Improvement Work On M50 In Gloucestershire To Begin

11/07/2025
Story Homes has submitted a full planning application to South Ribble Borough Council for a proposed new residential development in Longton, aiming to build on the success of its nearby Longton Grange scheme.
With the majority of homes now sold at Longton Grange, the developer is looking to meet co

11/07/2025
Essar Energy Transition (EET), through its subsidiary EET Property Limited, has completed the acquisition of Thornton Science Park.
The 66-acre site includes purpose-built laboratories, industrial facilities, and office space, and is set to play a central role in EET's ambition to create one of Eur

11/07/2025
Families are preparing to move into four newly completed houses for affordable rent at the Malthouse Meadows development in West Sompting, Adur.
The latest handover marks a key milestone in the delivery of high-quality, energy-efficient homes aimed at addressing local housing needs.
The four fami

11/07/2025
Galliford Try's project team at the Syngenta manufacturing site in Huddersfield has been shortlisted in two categories at the 2025 Constructing Excellence (CE) Yorkshire and Humber Awards, celebrating the success and resilience of a long-standing partnership spanning over two decades.
The team has

11/07/2025
Cambridgeshire County Council has appointed Morgan Sindall Construction to deliver a new secondary school at the heart of the Alconbury Weald development, continuing its investment in the region's educational infrastructure.
The new school, named Alconbury Weald Church Academy, will be run by the D

11/07/2025
Passengers and residents in Stone, Staffordshire, are being urged to prepare for a £7 million-plus package of railway upgrades set to improve safety, performance and long-term reliability on the West Coast Main Line.
The work, scheduled to take place during the summer school holidays, will include

11/07/2025
A ceremonial tile signing has marked a major milestone in the restoration of the historic Pippbrook House, as roof-level works near completion on the Grade II* listed building in Dorking.
Chair of Mole Valley District Council (MVDC), Councillor Roger Adams, led the event, joined by a host of guests

11/07/2025
ACS Construction Group has been appointed Principal Contractor by GE Vernova for a major infrastructure expansion at its Stafford HVDC Transformers facility, part of the company’s drive to support global decarbonisation through advanced transformer technology.
ACS commenced with the Test Supply Bui

10/07/2025
Vistry Group has agreed two major deals with housing provider Abri to enable the delivery of almost 200 affordable homes across Hampshire, marking a significant step forward in addressing local housing needs.
In Funtley, near Fareham, Vistry has completed a simultaneous land acquisition and forward

10/07/2025
Caddick Construction has officially completed its first Midlands project with the handover of Mansion House, a six-storey residential development comprising 58 new apartments, to joint venture partners Urban Splash and Places for People.
Located on the 43-acre Port Loop island alongside Birmingham