Modern Water and Northumbrian Services Limited have been appointed as preferred bidders for a new wastewater treatment plant in Gibraltar.
The contract will include the design, build, finance and operation of a wastewater treatment plant capable of treating urban wastewater for the entire population of Gibraltar as well as storm flows.
Discussions between the parties over the detailed terms of the Project will now commence. MWSL is the lead contractor in respect of the design and build of the Project with a current contract value of approximately £22 million.
As Gibraltar has the second highest population density in Europe and limited land availability the plant design will have a small footprint and low power requirements as electricity is at a premium in Gibraltar. The project scope requires the plant to be completely enclosed and landscaped to visually enhance the local environment as well as have stringent odour control to comply with rigorous emission standards. In addition,
a roof top car park will be provided under the contract terms. The plant will be designed to allow for future capacity upgrades over the life of the contract to meet population and effluent flow increases without interruption to the operation of the plant and be operated by the Joint Venture for 20 years.
UK
Ireland
Scotland
London











